Similar Projects
RFQ - Hydrological Study of O.R. Mitchell Lake
Term Contract
Bidding
$100,000 CJ est. value
San Antonio, TX 78205

RFP - Alamo Area Metropolitan Planning Organization (AAMPO) General Planning Services
Term Contract
Bidding
San Antonio, TX 78205

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

Asbestos Testing and Air Monitoring
Term Contract
Post-Bid

Rope Access Rigging and Safety Supervision and Gates Cleaning, Tainter Gates, Baffle Gates, and Bulkheads at Degray Lake, Ft. Pemberton Control Structure, JBJWW Lock and Dams 3 Through 5, Town Bluff D
Results

Annual Contract for Water Tank Inspection Services
Term Contract
Results
$53,900 est. value
San Antonio, TX

Statewide Non Abatement Services for Asbestos Containing Material, Mold, and Lead in Paint
Term Contract
Post-Bid

Txdot San Antonio District Professional Services Contract
Infrastructure
Results
San Antonio, TX

Statewide Inspection, Maintenance, and Repair Services for TxDOT Owned Radio Communication Towers
Term Contract
Post-Bid

Special Trilateral Projects Inspection Services
Infrastructure
Results
San Antonio, TX

Sunshade Inspection
Term Contract
Post-Bid
San Antonio, TX 78243

Region 7 Elevator Inspection Contract
Demolition
Post-Bid

Water Quality and Detention Pond Service and Inspection
Term Contract
Post-Bid
San Antonio, TX

2022 Condition Assessment Site Civil Work Order Project
Infrastructure
Post-Bid
San Antonio, TX

Professional Services Contract
Infrastructure
Post-Bid
$225,000,000 est. value
TX

Last Updated 08/25/2022 07:33 PM
Project Title

RFQ - 2022 Sanitary Sewer Overflow and Reduction Program (SSORP) CMOM and Inflow Engineering Design Services

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The San Antonio Water System (SAWS) is accepting Statements of Qualifications (SOQ) from firms to provide professional engineering design services, as well as all associated engineering services, necessary to advance the sanitary sewer overflow and reduction program (SSORP) projects identified within this RFQ to the final design phase, which includes both bid and construction phase services. SAWS will provide Respondents with design deliverables as part of this RFQ. It is anticipated that SAWS will award three (3) Capacity, Management, Operations and Maintenance (CMOM) Program Engineering Services contracts and two (2) Inflow Reduction Program Engineering Services contracts totaling approximately $10.5 million, as a result of this Request for Qualifications (RFQ). The method of contractor selection has not been determined at this time.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents