Similar Projects
Claremont Substation - Erosion Mitigation Construction
Infrastructure
Bidding
Colorado Springs, CO

Concrete and Asphalt Repairs at Timberview Middle School , Rockrimmon Elementary School and Pioneer Elementary School
Infrastructure
Bidding
Colorado Springs, CO 80919

Manitou Springs Creekwalk Trail Phases 4 and 5 Survey, Row and Design
Post-Bid
Manitou Springs, CO

Managed Parking
Post-Bid
Green Mountain Falls, CO

Palmer Lake Library Ramp
Results
Palmer Lake, CO 80133

Fountain Creek at Hanson Trailhead Project
Results
$1,750,000 to $2,100,000 est. value
Colorado Springs, CO 80903

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Granite Rock Trailhead Improvements
Results
Less than $50,000 est. value
Colorado Springs, CO 80907

Flying Horse Pond 1 Retrofit
Infrastructure
Post-Bid
Colorado Springs, CO

North Chelton Road Drainage Improvements
Results
Colorado Springs, CO 80903

Flying Horse Detention Pond 1 Retrofit CM and Geotechnical Engineering Services
Infrastructure
Post-Bid
Colorado Springs, CO

Manitou Avenue from Park Avenue to Serpentine Drive Construction Project
Results
Manitou Springs, CO 80829

Bus Stop Pad Replacement
Infrastructure
Post-Bid
Colorado Springs, CO

Pedestrian Crossing Installation at Sierra Madre Road
Results
Colorado Springs, CO

Widefield ADA Improvements (CDBG) Project
Infrastructure
Post-Bid
CO

Reported 03/01/2022 12:00 AM
Project Title

Sidewalk and Drainage Improvements on El Monte Place

Physical Address View project details and contacts
City, State (County) Manitou Springs, CO 80829   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is for Sidewalk and Drainage Improvements along El Monte Pl in Manitou Springs to include improving ADA accessibility. 1. The Contractor will provide project costs for crews and equipment, anticipated mobilization time, and anticipated project completion time. 2. The Contractor is responsible to provide all materials and equipment necessary for fabrication, construction, and/or installation of this project. 3. All waste shall be disposed of by the Contractor. 4. The Contractor is responsible for damages, inside or outside the project area. 5. The Contractor is responsible for their own confined space, roadway, and trenching safety procedures. 6. If the project requires street closure – partial or otherwise, the Contractor shall provide all necessary traffic control. All traffic control personnel must at a minimum carry a current CDOT Flagger Certification. A Traffic Control Plan must be submitted to and approved by City staff at the pre-construction meeting. The pre-construction is to be scheduled at time of accepting the contract. 7. Below is the Anticipated General Scope of Services for this project. The City of Manitou Springs will complete sidewalk, ADA and drainage improvements along El Monte Place, a major route to school for students to safely access our City’s only high school and middle school. This project would provide critical access to school with improved sidewalks, ADA access and drainage from a major throughout way, Manitou Avenue. The entire project area will accomplish a total of 1,500 sq ft of improved sidewalk and 500 LF of curb and gutter, (2) ADA curb ramps and installation of drainage in the roadway on El Monte Pl. The following elements are included: ? Sidewalk improvements including curb and gutter will be made along the northeast side of El Monte Place (from Bond St along El Monte Pl to the front of Manitou Springs High School, 492 El Monte Pl to 417 El Monte Pl) totaling 1500 square feet of sidewalk and 500 linear feet of curb and gutter. ? The sidewalk improvements will also include (2) ADA ramps on El Monte: one at Bond St (northeast side of street) and the other in front of Manitou Springs High School (north side of El Monte at approximately 417 El Monte Pl) ? Additional drainage is needed in this area. During and after weather events, water does not properly drain away from the sidewalk on the southwest side of El Monte Pl and turns this already hilly area into a hazard. New drainage will be installed diagonally along El Monte in the roadway from Fountain Place southward to just beyond Bond Street. This drainage improvement will ensure water is diverted away from the street and directed toward the grate that is at the bottom of El Monte Pl & Fountain Pl preventing flooding, standing water and icing over of this area.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents