Similar Projects
2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Bituminous Surface Treatment
Infrastructure
Post-Bid
$400,000 est. value
Quincy, IL

Parking Improvements at the Quincy Maintenance Yard / Sign Shop Parking Lot
Results
IL

2019 Bond Projects - Phase 2
Renovation
Results
Less than $8,311,066 est. value
Quincy, IL

Milling and Resurfacing Including Bituminous Materials
Infrastructure
Post-Bid
$500,000 est. value
Mendon, IL 62351

Resurfacing, Sidewalk Replacement, Curb and Gutter Replacement and Pavement Markings
Results
Quincy, IL 62301

Resurface CH 11
Infrastructure
Post-Bid
$4,000,000 est. value
Camp Point, IL

8.7 Miles of Hma Removal and 2 Pass Micro-Surfacing on I-172 from IL 96 to US 24, East of Quincy
Results
Quincy, IL

Courtyard Concrete Improvements
Infrastructure
Post-Bid
$98,000 est. value
Quincy, IL 62305

Sealing the Decks, Parapets and Concrete Bridge Approach Pavement on Various Structures throughout District 6
Results

Concrete Sidewalk Replacement
Infrastructure
Post-Bid
$460,000 est. value
Liberty, IL

Bill Klingner Trail Lot 16 - Parking Lot
Results
Quincy, IL 62305

Mill and Resurface FAS 1604 (Columbus Road)
Infrastructure
Post-Bid
$500,000 est. value
IL

Tar & Chip, Asphalt Milling & Resurfacing
Results
Quincy, IL 62301

Resurfacing of TR 467 (Lancaster Lane)
Infrastructure
Post-Bid
$500,000 est. value
Quincy, IL 62305

Last Updated 06/19/2022 11:04 PM
Project Title

2022 - 7th Ward Capital Improvements (MR 658) Project

Physical Address View project details and contacts
City, State (County) Quincy, IL   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Quincys MR 658 Project consists of 2750 square yards of PCC pavement, 2500 square feet of PCC sidewalk, 230 tons of hot-mix-asphalt, 600 feet of curb replacement, and related improvements. Work is to take place at six various locations in the City of Quincy.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents