Similar Projects
Evolve Biologics Manufacturing Facility
New Construction
Conception

Evolve Biologics Manufacturing Facility
New Construction
Conception

Leprino Foods Factory
New Construction - 850,000 SF
Design
$870,000,000 est. value
Lubbock, TX 79403

Mass Grading in Paradise Farms
Infrastructure
Design
$2,000,000 CJ est. value
Spring, TX 77373

Constructing New Lift Station
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Rosharon, TX 77583

Water Plant No. 1 Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$280,000 CJ est. value
Rosharon, TX 77583

Communication Infrastructure Upgrade
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Fort Hood, TX 76544

Pulse Fence Detection
Infrastructure
Sub-Bidding
$700,000 CJ est. value
New Boston, TX 75570

Aqualina at Tres Lagos Phase 1 Subdivision - Utility and Paving Improvements
Post-Bid
McAllen, TX 78504

StayApt Suites - Sitework
New Construction, Infrastructure
Post-Bid
Bryan, TX 77802

Thea Meadows Unit 4 Subdivision
Results
San Antonio, TX 78275

Foundation Stabilization for William Sinkin
Infrastructure
Results
Less than $50,000 est. value
San Antonio, TX 78204

Cornerstone Commerce Center
New Construction, Infrastructure - 413,173 SF
Construction
$32,067,840 CJ est. value
San Antonio, TX 78219

Cornerstone Commerce Center
New Construction, Infrastructure - 413,173 SF
Construction
$32,067,840 CJ est. value
San Antonio, TX 78219

7 Brew Coffee / Pharr
New Construction, Infrastructure - 510 SF
Pending Verification
$600,000 CJ est. value
Pharr, TX 78577

Last Updated 08/08/2022 12:38 PM
Project Title

SPR Packaging Oxidizer and Solvent Tanks

Physical Address View project details and contacts
City, State (County) Rockwall, TX 75087   (Rockwall County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Existing solvent tank on east side of building will be removed and relocated to west side of building where a new tank will be installed. At new tank location, existing parking will be removed and paving demolished for new tank foundations. An architect has been selected. As of August 8, 2022 a prospective general contractor has been identified. Building permit applications were submitted to City of Rockwall Building Inspections on April 16, 2022; however, no building permits have been issued to date. Construction is not anticipated to begin before late third quarter 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents