Similar Projects
Roundabout Construction - TH 22
Infrastructure
Conception
$2,400,000 CJ est. value
Mankato, MN 56001

Roundabout Construction - TH 22
Infrastructure
Conception
$2,400,000 CJ est. value
Mankato, MN 56001

Eastwood Industrial Park Office and Warehouse Development
New Construction, Infrastructure - 50,000 SF
Design
$26,850,000 CJ est. value
Mankato, MN 56001

Fox Meadows Residences
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Eagle Lake, MN 56024

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Results
Less than $356,970 est. value
Mankato, MN

Grading, Bituminous Mill and Overlay, Drainage and Snow Fence
Results
MN

Harrison Ford Automobile Dealership Addition
Addition, Demolition, Infrastructure - 3,941 SF
Construction
$1,000,000 CJ est. value
Mankato, MN 56001

Frost Plaza
New Construction, Infrastructure - 5,759 SF
Pending Verification
$2,000,000 CJ est. value
Mankato, MN 56001

Kalina Dental
New Construction, Infrastructure - 4,700 SF
Design
$1,410,000 CJ est. value
Mankato, MN 56001

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Blue Earth County Ditch No. 50
Results
$193,000 est. value
MN

Ditch 53-62 Main Trunk Repair
Infrastructure
Post-Bid

Blue Earth and Le Sueur Counties Judicial Ditch No. 15
Infrastructure
Results
$350,000 est. value

Last Updated 10/10/2022 03:07 PM
Project Title

Judicial Ditch No. 49 Repair Blue Earth & Faribault Counties

Physical Address View project details and contacts
City, State (County) Amboy, MN 56010   (Blue Earth County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $565,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Online Bidding: Available Fee for bidding online is $30.00 Est. Completion Date: Sept. 30, 2023 The project includes the following major quantities of Work: - Approximately 6.3 Acres of heavy vegetative clearing including 3 acres with small tree removal. Removal of 24 larger trees at designated locations called out in the plans. - Approximately 9,500 linear feet of open ditch cleaning including approximately 4,255 LF of sideslope repair. - Armoring sideslope repairs, culverts and existing tile outlets with riprap and geotextile fabric. - Installation of alternative side intakes and outlets, repair of existing tile outlets. - Seeding and erosion control.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents