Similar Projects
Bridge Reconstruction Including Removal and Replacement With a Culvert Precast Concrete Box and Approach Work on South Jackson Road
Demolition, New Construction, Infrastructure
Bidding
$1,988,000 CJ est. value
Jackson, MI 49201

Bridge Reconstruction Including Removal and Replacement With a Culvert Precast Concrete Box and Approach Work on South Jackson Road
Demolition, New Construction, Infrastructure
Bidding
$1,988,000 CJ est. value
Jackson, MI 49201

Concord Phase 2 Hive/Elementary
Addition, Demolition, Build-out, Renovation, Infrastructure - 14,000 SF
Sub-Bidding
$2,000,000 CJ est. value
Concord, MI 49237

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

12.72 Mi of Mainline And Ramp Alternate
Infrastructure
Results
Jackson, Parma, MI

Up to 137.32 Lnmi Of Hot Mix Asphalt Crack Treatment
Infrastructure
Results

New Elementary School - 2022 Bond - Western School District
Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Parma, MI 49269

Concord Elementary - 2022 Bond - Concord Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Concord, MI 49237

Hot Mix Asphalt Reconstruction and Pavement Markings on North Street
Infrastructure
Bidding
$510,000 CJ est. value
Napoleon, MI 49201

I-94 Rehabilitation/Reconstruction
Post-Bid
MI

Central Fire Station Site Improvements
Alteration
Results
Jackson, MI 49201

Middle School - 2022 Bond - Concord Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Concord, MI 49237

Cooper Street Correctional Facility - Storage Building
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Jackson, MI 49201

RFP Design - Mental Health Office Remodel and Addition - Parnall Correctional Facility
Addition, Demolition, Build-out, Infrastructure
Post-Bid
$100,000 CJ est. value
Jackson, MI 49201

Last Updated 07/04/2023 08:02 AM
Project Title

RFQP Engineering - Mlk Corridor Reimagined Engineering

Physical Address View project details and contacts
City, State (County) Jackson, MI 49203   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000321571 The City of Jackson is inviting qualified consulting firms to submit proposals for engineering services required for major street reconstruction on Martin Luther King Jr. Drive from South Street to Morrell Street in the City of Jackson. Reconstruction will include the following: Full depth pavement reconstruction Curb replacement for a reduced street width Replacement of permanent signs Construction of a mixed-use micro-mobility trail on one side of the street Sidewalk replacement on one side of the street Installation of low level decorative streetlights Infill tree plantings Water main and associated water service replacements Sanitary sewer and associated sewer service lateral replacements to right-of-way limits Traffic signal reconstruction with mast arm mounted signals at the High St and Prospect St intersections This project will be funded by a combination of federal grant money, City Water Funds, City Sewer Funds, City Major Street Funds and Special Assessments. The City of Jackson has applied for a Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Grant for the roadway construction and an Environmental Protection Agency (EPA) Grant for the water main and sanitary sewer construction. The construction of this project will be completed by two separate contracts. The construction contract for water main and sanitary sewer replacements will be let by the City of Jackson in September of 2024. Construction shall commence in April 2025 and be substantially complete with the street open to traffic in September 2025. The construction contract for street reconstruction and associated non-motorized facilities, lighting and traffic signals will be let by the Michigan Department of Transportation (MDOT) through the Local Agency Programs (LAP) office in September 2024. Construction shall commence in June 2025 and be substantially complete with the street open to traffic in October 2026. Questions are submitted online No Contact Information Shelly Allard 517-788-4020 sallard@cityofjackson.org

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents