Similar Projects
Bavarian Inn Lodge - Flood Plain
Renovation
Post-Bid
Frankenmuth, MI 48734

Carpet Installation
Post-Bid
Detroit, MI

Campus-Wide Flooring Contractors Maintenance Services
Results
Lansing, MI

2019 Floor Maintenance
Results
Corunna, MI

2020 Laboratory Testing Indefinite Scope Indefinite Delivery Contract
Post-Bid
Lansing, MI

Webberville Elementary Gym Floor
Results
Webberville, MI

Carpet Riverside and Washington Woods
Term Contract
Post-Bid
Midland, MI

Carpet Cleaning Services - West Bloomfield Library
Results
Less than $14,010 est. value
West Bloomfield, MI

Lobby 1st Floor Hallway Carpet Project
Post-Bid
Sterling Heights, MI 48312

Community Center Flooring Replacement
Results
Ypsilanti, MI

Carpet Replacement at The Public Library
Post-Bid
Southfield, MI

Police Dept Cell Block Flooring
Results
Madison Heights, MI 48071

Flooring and Installation at Oakwoods Nature Center
Post-Bid
Brighton, MI

Provision and Installation of Rubber Floor Tile at the Ice Arena
Results
Less than $37,815 est. value
Farmington Hills, MI 48336

Prairieview Elementary and Minges Brook Elementary School
Post-Bid
Battle Creek, MI 49015

Last Updated 06/02/2021 04:59 PM
Project Title

K.I. Sawyer Elementary School Flooring Abatement

Physical Address View project details and contacts
City, State (County) Gwinn, MI 49841   (Marquette County)
Category(s) Single Trades
Sub-Category(s) Environmental, Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the regulated removal of Asbestos Containing Materials (ACM) from the project site. The work consists of development and submittal of appropriate documents related to these Specifications; pre-cleaning for asbestos containing debris, as necessary; establishment and use of asbestos regulated work areas, including decontamination units; selective interior demolition to access hidden ACM’s or to verify its absence, removal, packaging, transportation and disposal of removed ACM; and, demobilization, all in accordance with referenced regulatory requirements and these Specifications. Items specified for removal include any ACM that may be impacted by the current renovation project.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents