Similar Projects
Buffalo Public School 97 - Interior Painting and Finishes Restoration - 2020
Post-Bid
Buffalo, NY 14211

Carpet and Tile Installation and Removal
Term Contract
Post-Bid
Buffalo, Orchard Park, Williamsville, NY 14203

Amherst Central School District Capital Outlay 2018/2019
Results
Less than $85,000 est. value
Amherst, NY 14226

Theodore Roosevelt Elementary Capital Outlay Project - Vestibule/Exterior Door Replacements
Results
Less than $100,000 est. value
Buffalo, NY 14206

Suspended Ceiling Tile and Grid Replacement
Post-Bid
Williamsville, NY 14221

Solar Blinds
Results
Buffalo, NY 14202

Frontier CSD Capital Outlay Project - Pinehurst Elementary School
Post-Bid
Lake View, NY

Workforce Development Center Building Refresh
Results
Less than $15,000 est. value
West Seneca, NY 14224

Capital Outlay Project 20/21
Post-Bid
Depew, NY 14043

Farber Hall Add Stair Tower for Classroom Renovations
Results
Buffalo, NY 14260

Cheektowaga Sloan UFSD Capital Outlay Project 2020-2021
Post-Bid
Less than $75,000 est. value
Cheektowaga, NY 14227

Eden Central School District - Capital Outlay Project 2018-2019
Results
Less than $100,000 est. value
Eden, NY 14057

Metro Babcock Street Bus Garage T-Beam Repair
Results
Less than $75,000 est. value
Buffalo, NY 14206

Interior Painting and Finishes Restoration
Results
Buffalo, NY 14210

P-Tech Makeover and Signage
Results
West Seneca, NY 14224

Last Updated 09/08/2020 08:23 AM
Project Title

Permit Room Rehabilitation

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14219   (Erie County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide and install perimeter gypsum wallboard assemblies. acoustical ceiling grid, and ceiling tiles in the permit room at the Erie County Southtowns water resource recovery facility. No HVAC ducting or vents will be required. During the rehab, a one-week break must be provided for DSM staff to relocate outlets and switches prior to the installation and finishing of drywall. Vendor to also provide a 2-day break before the installation of new acoustical ceiling tile. Prior to commencement of work, the room will clear of all equipment and the existing suspended ceiling will be removed. Gypsum Wallboard Assemblies 3 5/8" 20ga EQ Metal Stud Framing at 16" OC on all walls 3" Thermafiber Batt Insulation in all walls 5/8" Type X Gypsum Wall Board on all walls All walls except East wall, shall terminate 6" above new ceiling tile at 9'6" East Wall Sound attenuation specifications Wall to extend from floor to deck 3/8" Thermafiber Batt Insulation 1/2 Blue Ridge Sound Stop Board Framing 1/2 25ga RC Channel over Sound Stop Board 5/8 Type X Gypsum Wall Board Acoustical Ceiling Tile Armstrong Fine Fissured #1756 2x2x7/8 white ceiling tile Armstrong 15/16 White prelude grid 9'6" AFF Sound Caulk at top, Bottom, and Sides

Details

Division 09 - Finishes, Gypsum Board, Acoustical Ceilings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents