Similar Projects
Northeast Elementary School
New Construction
Results
Bismarck, ND 58503

Southside Elementary School
Renovation
Conception
Bismarck, ND 58503

Lakewood Elementary School BP-2
New Construction, Renovation
Results
Mandan, ND 58554

Westside Elementary Interior Remodeling
Renovation
Results
West Fargo, ND 58078

Grand Forks Public Schools K-8 Campus
New Construction - 215,000 SF
Conception
$64,100,000 est. value
Grand Forks, ND 58203

Horace Elementary
Renovation, Addition
Results
Horace, ND 58047

Construction Management at Risk Bismarck Public Schools
Addition
Results
Bismarck, ND 58503

New Elementary School 15
New Construction - 66,000 SF
Design
$17,600,000 est. value
West Fargo, ND 58104

New Oberon Public School
New Construction
Post-Bid
Oberon, ND

Northwest Elementary School
New Construction
Post-Bid
Bismarck, ND 58501

New Elementary in Rocking Horse Farm
New Construction
Bidding
West Fargo, ND

Explorer Academy at Lewis and Clark ES
Addition, Alteration
Results
$8,127,323 est. value
Fargo, ND 58103

Career & Technological Education Expansion
Addition
Conception
$2,611,000 est. value
Cavalier, ND

Pool Facility Renovations
Renovation
Results
Less than $280,000 est. value
Devils Lake, ND 58301

Last Updated 03/09/2022 06:53 PM
Project Title

Gussner Elementary

Physical Address View project details and contacts
City, State (County) Jamestown, ND 58401   (Stutsman County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager - 02/11/22
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a HVAC replacement and associated finishes for the Gussner Elementary School. The Scope of Work includes various bid packages including but not necessarily limited to the following: Demolition General Construction Carpentry Solid Surface Fabrications Built-Up Roofing Sheet Metal Flashing and Trim Joint Sealants Hollow Metal Doors and Frames Door Hardware Gypsum Board Assemblies Acoustical Ceilings Interior Panting Fire Suppression Plumbing Heating, Ventilation, and Air Conditioning Electrical

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents