Similar Projects
Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

Replace Superstructure
New Construction, Infrastructure
Conception
$3,646,000 est. value
Lynnville, IN 47619

Whiteland Industrial Park
New Construction - 9,097,000 SF
Design
Whiteland, IN 46184

Zesco Products Warehouse
New Construction - 23,000 SF
Design
$2,000,000 est. value
Indianapolis, IN 46202

Additions and Renovations to Edgewood Intermediate School
Addition, Demolition, Renovation, Infrastructure
Bidding
$17,085,730 CJ est. value
Indianapolis, IN 46239

Cottonwood Drive and Potters Lane Infrastructure Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Clarksville, IN 47129

Lakeside Park Tennis and Basketball Courts Lighting
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Fort Wayne, IN 46805

Plymouth Phase 3 Taxiway Lighting
Infrastructure
Sub-Bidding
$900,000 CJ est. value
Plymouth, IN 46563

Site Improvements and Related Work at Various Locations
Post-Bid
IN

Site Improvements at the New Bartholomew County Landfill
Post-Bid
IN

Union Center Elementary School Additions & Renovations - 2022
Addition, Demolition, Renovation, Infrastructure
Results
$5,156,852 CJ est. value
Valparaiso, IN 46385

Garage Helices Fabric Structure Repair
Results
Indianapolis, IN 46241

Smith Transport Distribution Facility
New Construction
Construction
$11,000,000 est. value
Remington, IN 47977

Menards Warehouse
Addition - 32,267 SF
Construction
Carmel, IN 46033

Warehouse
New Construction - 263,498 SF
Pending Verification
$10,000,000 CJ est. value
IN

Last Updated 08/15/2022 02:33 PM
Project Title

Police Department Storage Building

Physical Address View project details and contacts
City, State (County) Crothersville, IN 47229   (Jackson County)
Category(s) Commercial, Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 15, 2022, project is cancelled. Project is no longer needed. THIS PROJECT CONSISTS OF A LUMP SUM BID FOR THE CONSTRUCTION OF A NEW 1,600 SQUARE FOOT FACILITY WITH POST FRAME CONSTRUCTION, UTILITY SYSTEMS, SITE ACCESS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS AND RELATED ITEMS. After review and award of a contract, the Owner will provide a "Notice to Proceed" to the Contractor. Contractor will then have 10 working days after said "Notice to Proceed" to commence construction and 150 days total to achieve substantial completion and an additional 30 days to complete all work for this project, for a total of 180 days after issuance of "Notice to Proceed" to project closeout. Substantial completion date is therefore anticipated to be DECEMBER 12, 2022 and final completion date is therefore anticipated to be JANUARY 11, 2023, based on a Contract approval by JULY 5, 2022, and Notice to Proceed dated JULY 15, 2022. Contractor will be assessed $300.00 a day liquidated damages for any work remaining over and above either of the specified contract completion dates. Payment to be made on a standard monthly claim basis, with 10% retainage, and said retainage may be held up to three months after the successful completion of this contract. The work to be performed and the bid to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. Each bid must be accompanied by a Bid Bond or Certified Check in a sum equal to 5% of the amount of the bid unless otherwise specified, and a completed Non-Collusion Affidavit. Bid prices must be firm for a period of ninety (90) days from the bid opening date. Should a successful bidder withdraw his bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of his bid, the owner may declare the Bid Security forfeited as liquidated damages, not as penalty. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the contract sum with an approved surety company. Said bond shall remain in full force and effect for a period of one (1) year after date of final acceptance of the work. The TOWN OF CROTHERSVILLE, reserves the right to accept or reject any bid and to waive any or all formalities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents