Similar Projects
Homestead Phase Four
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Burke Lane Subdivision
New Construction, Infrastructure
Design
$69,000,000 CJ est. value
Farmington, UT 84025

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Lewiston City Sewer System Upgrades
Infrastructure
Bidding
$3,500,000 CJ est. value
Lewiston, UT 84320

I-15; SR-20 to South Beaver Rehabilitation High Volume
Infrastructure
Bidding
$15,000,000 CJ est. value
Beaver, UT 84713

Clearfield Station Tod Infrastructure Project
Infrastructure
Post-Bid
Clearfield, UT 84015

Baseball Concrete Improvements Project
Renovation
Post-Bid
Price, UT

Ellison Park Pickleball Complex And Restroom
Renovation
Results
Layton, UT 84041

Washington Park Architectural Services
Renovation
Results
$2,500,000 est. value
Bountiful, UT 84010

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Alta Townhomes & Commercial Development
New Construction, Infrastructure - 9,481 SF
Pending Verification
$17,000,000 CJ est. value
Clearfield, UT 84015

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

Cynthia Way And Dorthea Way - City of North Salt Lake
Infrastructure
Conception
$416,250 CJ est. value
North Salt Lake, UT 84054

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

Last Updated 12/02/2022 02:06 AM
Project Title

2023 Ballfield Complex Enhancements - Rebid

Physical Address View project details and contacts
City, State (County) Gunnison, UT 84634   (Sanpete County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions about the Project should be given to the City's Project Administrator by email before December 9 at Noon. Responses to questions will be given through the State U3P portal. Project Administrator: Dennis L. Marker, City Administrator 38 West Center Street, Gunnison City, UT 84634 Email: dmarker@gunnisoncity.org Gunnison City has partnered with the local school district, business owners and citizens to revitalize the Gunnison Valley baseball/softball complex. The city now desires to work with an independent contractor to complete the planned improvements and upgrades at the complex. The project will include changing and/or installing new LED ballfield lighting, shade canopies, spectator protective netting, expanded concessions area, and eating facilities. The project will include additional bleachers, shade canopies, picnic area and ballfield lighting Study Location: The ground is located at approximately 90 East 500 South in Gunnison and is attached to the South Sanpete School District Educational campus. The lights for the three softball fields need to be converted to LED lights and oriented for optimal field lighting. Lighting of the fields currently includes the following: o Northwest Field (26 lights on 6 poles) o Northeast Field (26 lights on 6 poles) o Southeast Field (24 lights on 6 poles) This item shall include preparation of a photometric plan based on national high school ballfield lighting standards* and using existing light pole locations and poles, conversion of current lights to LED, electrical upgrades as necessary, installation and orientation of lights to meet the prepared photometric plan. For lighting purposes, the northeast field is the high school's competition softball field. The northwest and southwest fields are recreation fields fastpitch/softball fields. Baseball field Lights Additive Alternate There are currently no ballfield lights for the southwest (high school baseball) field. A lighting study similar to Item 1 shall be prepared along with a cost estimate for poles and lights for this field. This item includes the cost of preparing the study and cost estimate. Depending on availability of funds, the city may authorize the lighting of the baseball field per the prepared lighting plan

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents