Similar Projects
HVAC Maintenance Services
Term Contract
Design
Middletown, Newark, DE - Easton, Prince Frederick, MD

HVAC Maintenance Services
Term Contract
Design
Middletown, Newark, DE - Easton, Prince Frederick, MD

HVAC Preventive Maintenance for Police and Correctional Training Commissions
Term Contract
Bidding
Eldersburg, Sykesville, MD 21784

Building 302 Major Equipment Replacement
Term Contract, Alteration
Bidding
$5,000,000 to $10,000,000 est. value
Gaithersburg, MD 20899

NIF 4.7T Electronics Room Air Handler & Chilled Water Coil Replacement
Post-Bid
Bethesda, MD 20814

Combined Heat and Power at Douglass Homes
Post-Bid
MD 21202

One (1) Dust Collector System
Results
Aberdeen Proving Ground, MD 21005

BARC - Overhaul Building 010A Chiller #2
Results
Beltsville, MD 20705

HVAC Upgrades for Printshop and Mailroom
Alteration
Bidding
Salisbury, MD 21804

HVAC Preventive Maintenance and Repair for Air Monitoring Shelters
Term Contract
Post-Bid
Baltimore, MD

Tie-In Chiller Plant #2 Into The New Campus Chilled Water Loop
Results
Frederick, MD

Matthew Henson Middle School HVAC Replacement
Alteration
Bidding
$600,000 to $700,000 est. value
Indian Head, MD 20640

Full Service Preventive Maintenance Contract for York/JCI HVAC Equipment
Term Contract
Post-Bid
$100,000 to $500,000 est. value
College Park, MD

AHU Replacement at Thomas Johnson Elementary School 84
Results
Baltimore, MD 21230

Washington County Day Reporting Center Heat Pump Replacement
Alteration
Bidding
Hagerstown, MD 21740

Last Updated 04/19/2022 12:16 PM
Project Title

Cecil Manor Elementary School HVAC Replacement Project

Physical Address View project details and contacts
City, State (County) Elkton, MD 21921   (Cecil County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 03/07/22
Owner View project details and contacts
Architect View project details and contacts
Description

The school’s current HVAC system is from 1995 when the building was renovated. This project consists of an entirely new system to replace boilers, pumps, miscellaneous boiler room appurtenances, and boiler room controls as well as replace facility-wide pneumatic controls with DDC controls. Replace terminal HVAC equipment including RTU's, MUA, unit heaters, unit ventilators, fan coil units, VAV boxes, and exhaust fans, and replace classroom unit ventilators with vertical unit ventilators and supply ductwork. Replace air-cooled chiller with air-cooled split system chiller as well as replace the domestic hot water heater with new commercial gas-fired hot water heater.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents