Similar Projects
Peach Orchard Road Industrial Building
New Construction, Infrastructure - 300,000 SF
Conception
$32,400,000 CJ est. value
Salisbury, NC 28147

Peach Orchard Road Industrial Building
New Construction, Infrastructure - 300,000 SF
Conception
$32,400,000 CJ est. value
Salisbury, NC 28147

Henderson Grove Church Road Industrial Building
New Construction, Infrastructure - 756,000 SF
Design
$45,000,000 CJ est. value
Salisbury, NC 28147

Henderson Grove Church Road Industrial Building
New Construction, Infrastructure - 756,000 SF
Design
$45,000,000 CJ est. value
Salisbury, NC 28147

Eagles Nest 3
New Construction, Renovation - 7,745 SF
Post-Bid
Salisbury, NC 28144

Traffic Signal System Network Upgrades
Infrastructure
Post-Bid
$70,000 CJ est. value
Salisbury, NC 28144

Asphalt Surface Treatment - (AST)
Infrastructure
Results
$5,000,000 est. value
NC

Grading, Drainage, Paving, Signals, and Structure
Infrastructure
Results
$2,000,000 est. value
Salisbury, NC 28147

Bankett Station
New Construction - 11,929 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Salisbury, NC 28144

The Bell Block Building
Renovation - 17,000 SF
Construction
Salisbury, NC 28144

Bear Poplar Solar Farm
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Mount Ulla, NC 28125

Bear Poplar Solar Farm
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Mount Ulla, NC 28125

Pump Station Improvements - City of Salisbury
Renovation, Infrastructure
Conception
$600,000 CJ est. value
Salisbury, NC 28144

Collins Walk Residential Development / China Grove
New Construction
Design
$146,000,000 est. value
China Grove, NC 28023

East Spencer CDBG-I Sewer Rehabilitation and Replacement
Infrastructure
Post-Bid
$300,000 CJ est. value
East Spencer, NC 28144

Last Updated 07/21/2023 03:38 PM
Project Title

Salisbury Oaks Apartments

Physical Address View project details and contacts
City, State (County) Salisbury, NC 28144   (Rowan County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Funding, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $13,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of four apartment buildings on 9.227 acres. Scope details have not been released. As of July 21, 2023, this project is on hold pending funding. State tax credit funding was not awarded. The Salisbury City Council approval has approved a rezoning request and a master plan. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents