Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Walmart Supercenter #1427-251 - Smart Bundle
Renovation - 203,007 SF
Design
Circleville, OH 43113

Sanitary Repair for Pickaway County Jail
Infrastructure
Bidding
$1,184,146 CJ est. value
Circleville, OH 43113

SR 56 - Culvert Replacement
Infrastructure
Bidding
$420,000 CJ est. value
Circleville, OH 43113

Road Maintenance and Improvements
Post-Bid
South Bloomfield, OH 43103

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Cedar Heights Road Phase 1 and Phase 2 Contract 1-2020
Results
Circleville, OH

Mclean Mill Road Widening Phase I
Results
$271,730 est. value
Circleville, OH

Walmart Supercenter #1427-246 - Entertainment Optimization
Renovation - 20,300 SF
Construction
Circleville, OH 43113

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Turner Drive Street Reconstruction Project
Results
Less than $427,900 est. value
Circleville, OH 43113

Roadway Minor Rehab
Alteration
Design
$3,402,000 est. value
Ashville, OH

Chip and Sealing
Infrastructure
Post-Bid
Orient, OH

2021 County and Township Resurfacing Program
Results
OH

Last Updated 08/16/2022 04:10 PM
Project Title

Sheetz / South Bloomfield

Physical Address View project details and contacts
City, State (County) South Bloomfield, OH 43103   (Pickaway County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details and the location have not been released. As of August 16, 2022 the project is in planning stage. Information regarding municipal approvals, the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents