Similar Projects
Donlin Gold Natural Gas Pipeline
New Construction, Infrastructure
Conception
$1,122,300,000 CJ est. value
Anchorage, AK 99501

Donlin Gold Natural Gas Pipeline
New Construction, Infrastructure
Conception
$1,122,300,000 CJ est. value
Anchorage, AK 99501

AK Anchorage T 2016(1), Connecting Anchorage Trail Improvements
New Construction, Infrastructure
Bidding
$3,186,592 CJ est. value
Anchorage, AK 99501

AK Anchorage T 2016(1), Connecting Anchorage Trail Improvements
New Construction, Infrastructure
Bidding
$3,186,592 CJ est. value
Anchorage, AK 99501

Port Of Alaska Utility Locates
Alteration
Post-Bid
Less than $50,000 est. value
Anchorage, AK

Mountain View Pavement Rehabilitation
Infrastructure, Alteration
Post-Bid
$1,000,001 to $3,000,000 est. value
Anchorage, AK 99529

Washburn Street Area Reclamation
Infrastructure
Results
$500,001 to $1,000,000 est. value
Anchorage, AK 99502

Anchorage Golf Course Sidewalk Repairs
Infrastructure
Results
Anchorage, AK 99507

Providence Drive Resurfacing - Lake Otis Parkway to Elmore Road - Project A - Municipality of Anchorage
Infrastructure
Pending Verification
$2,600,000 CJ est. value
Anchorage, AK 99508

Providence Drive Resurfacing - Lake Otis Parkway to Elmore Road - Project A - Municipality of Anchorage
Infrastructure
Pending Verification
$2,600,000 CJ est. value
Anchorage, AK 99508

Wonder Park Elementary School Replacement - Anchorage School District
New Construction, Infrastructure
Conception
$33,001,000 CJ est. value
Anchorage, AK 99508

Construct Mental Health Building and Surface Parking Alaska
Addition, Demolition, Infrastructure, Renovation
Bidding
$20,000,000 CJ est. value
Anchorage, AK 99504

Year-Round Road Maintenance Services for Glen Alps Service Area (SA)
Infrastructure
Post-Bid
Less than $270,000 est. value
Anchorage, AK 99516

Anchorage Golf Course Cart Path Repairs
Infrastructure
Results
$1 to $100,000 est. value
Anchorage, AK 99507

Anchorage Senior Activity Center Renovations Phase II - PW2012053 - Municipality of Anchorage
Addition, Demolition, Renovation, Infrastructure
Conception
$1,350,000 CJ est. value
Anchorage, AK 99501

Last Updated 09/08/2022 05:40 AM
Project Title

2022 ADA Project

Physical Address View project details and contacts
City, State (County) Anchorage, AK 99501   (Anchorage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $409,070 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services consisting of approximately 480 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 36 Curb Ramps; 1070 L.F. of Curb and Gutter Removal and Replacement; 20 Tons of A.C. Pavement; 130 S.Y. of Pavement Removal; 5 Catch Basins; 86 L.F. of Storm Pipe Removal and other related work. Estimated Construction Cost: Between: $50,000 - $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Site Visit: N/A Pre-Bid Conference: N/A Questions Due: 5:00 P.M. Local Time, July 7, 2022 All Questions Shall Be Submitted Prior to the Question Due Date This Will Be the Final Opportunity to Ask Questions or Request Clarifications. Requests for interpretation or clarification of the bidding Documents shall be made in writing to the Purchasing Office (wwpur@muni.org). Please reference the Invitation to Bid Number and Project Title. Do not contact the specified department directly. The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding forty-five (45) days from the time of the opening. The Municipality shall not be responsible for bid preparation costs, nor for costs, including attorney fees, associated with any (administrative, judicial or otherwise) challenge to the determination of the lowest responsive and responsible bidder and/or award of contract, and/or rejection of bids. By submitting a bid, each bidder agrees to be bound in this respect and waives all claims to such costs and fees. Contracts shall be awarded by written notice issued by the Purchasing Officer to the lowest responsive and responsible bidder; however, preference will be given to local bidders in compliance with Anchorage Municipal Code Section 7.20.040. The Municipality of Anchorage assumes no responsibility for any interpretations or presentations made by any of its officers or agents unless such interpretations or presentations are made by written addendum to this Invitation to Bid. Bonding Requirements are per MASS/MASS B or as per special provisions.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents