Similar Projects
Last Updated 11/23/2021 12:33 PM
Project Title

Phase IV Water Line Upgrades and Improvements

Physical Address View project details and contacts
City, State (County) Bath, WV   (Morgan County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 LS Mobilization/Demobilization, 1 LS Pre-Construction Video Recording, 13,000 LF Restoration of Disturbed Area, 1 LS Erosion and Sedimentation Controls, 4,700 LF WVDOH Type "B" Trench Repair, 2,500 LF WVDOH Type "C" Trench Repair, 3,400 LF Full Width Roadway Stone Repair, 180 LF Open Cut 3/4" Polyethylene Service Tubing with 2" PVC Casing, 2,900 LF Open Cut 3/4" Polyethylene Service Tubing without 2" PVC Casing, 700 LF Bored and Jacked 3/4" Polyethylene Service Tubing with 2" PVC Casing, 600 LF Bored and Jacked 1" Polyethylene Service Tubing with 2" PVC Casing, 60 LF Open Cut 1" Polyethylene Service Tubing with 2" PVC Casing, 1,210 LF Open Cut 1" Polyethylene Service Tubing without 2" PVC Casing, 420 LF Open Cut 2" Polyethylene Service Tubing without 2" PVC Casing, 5,300 LF 2" PVC Water Line, 8,100 LF 6" AWWA C909 (Pressure Class 235 PSI) PVCO Water Line, 1,400 LF 6" AWWA C909 (Pressure Class 305 PSI) PVCO Water Line, 1,000 LB Fittings(s) and Concrete Thrust Block(s) Not Shown in Plans, 4 EA Tie-In New 6" Water Line to Existing 6" Water Line Including One (1) Gate Valve, 2 EA Tie-In New 2" Water Line to Existing 2" Water Line Including One (1) Gate Valve, 1 EA Hot Tap Tie-In New 6" Water Line to Existing 6" Water Line, 3 EA Hot Tap Tie-In New 6" Water Line to Existing 8" Water Line, 1 EA Cut and Cap/Plug Existing 8" Water Line, 4 EA Cut and Cap/Plug Existing 6" Water Line, 1 EA Cut and Cap/Plug Existing 3" Water Line, 1 EA Cut and Cap/Plug Existing 2" Water Line, 1 EA Cut and Cap/Plug Existing 3/4" Water Line, 6 EA 2" Hidden Flushing Hydrant Assembly, 4 EA 3/4" Air Release Valve Assembly, 14 EA Reinforced Concrete Anchor, 59 EA 5/8" X 3/4" Low Pressure Single Meter Setting with New Meter, 21 EA 5/8" X 3/4" High Pressure Single Meter Setting with New Meter, 13 EA 5/8" X 3/4" Low Pressure Dual Meter Setting with New Meters, 1 EA 1" Low Pressure Meter Setting with New Meter, 2 EA 2" High Pressure Meter Setting with New Meter, 13 EA 3/4" Connection to Existing Meter Setting, 2 EA 1" Curb Stop, 1 EA 2" Curb Stop, 28 EA 6" Gate Valve, 15 EA 2" Gate Valve, 8 EA Fire Hydrant Assembly, 200 LF 12" Open Cut Steel Casing with 6" AWWA C909 (Pressure Class 235 PSI) PVCO Water Line, 70 LF 12" Bored and Jacked Steel Casing with 6" AWWA C909 (Pressure Class 235 PSI) PVCO Water Line, 100 LF 6" Open Cut Steel Casing with 2” PVC Water Line, 40 LF 6" Bored and Jacked Steel Casing with 2” PVC Water Line, 2 EA Fire Hydrant Removal, 1 EA Fire Hydrant Demolition, 36 EA Gate Valve Demolition, 26 EA Sanitary Sewer Lateral and Private Drain Line (Up to 6" Nominal Diameter) Repair Per Detail, 140 LF 12" AASHTO M 294 Dual Wall Type S Bell and Spigot Style or Watertight HDPE Storm Sewer, 140 LF 15" AASHTO M 294 Dual Wall Type S Bell and Spigot Style or Watertight HDPE Storm Sewer, 60 LF 18" AASHTO M 294 Dual Wall Type S Bell and Spigot Style or Watertight HDPE Storm Sewer, 40 LF Remove and Replace Existing Slot Drain as Necessary on Sheet 7, 1 LS Restore Landscaping with Dark Mulch and Seasonal Ferns on Sheet 8.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents