Similar Projects
Last Updated | 05/23/2022 03:00 AM |
Project Title | Dobson High School Girls PE Boiler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Mesa, AZ 85202 (Maricopa County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Existing boiler and storage tank to be removed and all water lines/gas lines and all electrical to be capped off in a safe manner for the removal of the boiler and tank. Contractor to provide design/labor and materials for a tankless water heating system with enough output to provide continual hot water at the showers and hand wash stations. Run new gas lines and electrical as needed for the install of the new system. Hot and cold water shut off valves (ball valves) to be installed on the main water supply lines. Replace existing thermostatic mixing valves with new valves. (symmons is the preferred brand for the Mesa School district.) Replace all isolation valves with ball valves. Manifold the tankless water heaters so that unit can be isolated independently for redundancy in the event of failure or maintenance. Add emergency shut off solenoid valve on the gas line. Contractor shall provide the district with AS-BUILTS upon completion. Including clearance dimensions around the new equipment. Contractor to provide district personnel on installation training and preventative maintenance training during installation and after installing. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |