Similar Projects
Highland Elementary School Central Plant Upgrades
Term Contract
Bidding
$100,000 est. value
Mesa, AZ 85213

Chiller Replacement for Meyer Montessori Elementary School
Alteration
Bidding
$500,000 est. value
Tempe, AZ 85282

4410--Diagnose and Repair Boiler Safety Devices
Post-Bid
Phoenix, AZ

J041--644 Boiler Water Treatment
Post-Bid
Phoenix, AZ 85012

Qualified Select Bidders List / HVAC Mechanical Yard - Lomas Elementary
Term Contract
Results
Phoenix, AZ 85044

Carson JR High School P.E. Hot Water Boiler Replacement
Results
Mesa, AZ 85201

4410--644 Survey Design Install Boiler Quick Connects
Term Contract
Post-Bid
Phoenix, AZ 85012

H345--644-Boiler End of Life Study
Results
Phoenix, AZ 85012

4410--644 Temporary Boiler
Term Contract
Post-Bid
Phoenix, AZ 85012

Boiler Maintenance and Repair Services
Term Contract
Results
Phoenix, AZ

4410--644 Survey Design Install Boiler Emergency/ Auxiliary Connection
Term Contract
Post-Bid
Phoenix, AZ 85012

Dual Pump Condensate Tank Unit Replacement/Installation
Term Contract
Results
Phoenix, AZ 85004

Annual Inspection and Service To Boilers and Chillers, USDA Maricopa, AZ
Term Contract
Post-Bid
Maricopa, AZ

City Fountain Maintenance Services
Alteration
Results
Avondale, AZ 85323

Mechanical, Electrical, Plumbing and Fire Alarm Job Order Contracting Statewide
Alteration
Post-Bid
Phoenix, AZ

Last Updated 05/23/2022 03:00 AM
Project Title

Dobson High School Girls PE Boiler Replacement

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85202   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Existing boiler and storage tank to be removed and all water lines/gas lines and all electrical to be capped off in a safe manner for the removal of the boiler and tank. Contractor to provide design/labor and materials for a tankless water heating system with enough output to provide continual hot water at the showers and hand wash stations. Run new gas lines and electrical as needed for the install of the new system. Hot and cold water shut off valves (ball valves) to be installed on the main water supply lines. Replace existing thermostatic mixing valves with new valves. (symmons is the preferred brand for the Mesa School district.) Replace all isolation valves with ball valves. Manifold the tankless water heaters so that unit can be isolated independently for redundancy in the event of failure or maintenance. Add emergency shut off solenoid valve on the gas line. Contractor shall provide the district with AS-BUILTS upon completion. Including clearance dimensions around the new equipment. Contractor to provide district personnel on installation training and preventative maintenance training during installation and after installing.

Details

Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents