Similar Projects
Snowden Community Sewer - Phase 2 - Division II
Bidding
Mount Pleasant, SC 29464

Installation of Residential Septic Systems (18 Sites)
Post-Bid
North Charleston, SC

Pre-Cast ARV Manhole Top Structures
Term Contract
Post-Bid
North Charleston, SC

North Charleston SC - Little Avenue Sewer Main
Results
Less than $723,230 est. value
North Charleston, SC

Poe Street and Citadel Street Sewer Replacement
Results
Sullivan's Island, SC

Johns Island Wastewater Interceptor Rehabilitation Phase 1
Post-Bid
Johns Island, SC 29455

On-Call Catch Basin - Charleston County
Results
SC

Langley Trunk Interceptor and Navy Base Force Main Rehabilitation – Phase 9
Post-Bid
North Charleston, SC 29406

FY20 Manhole Rehabilitation Project
Results
North Charleston, SC 29405

Pump Station 02 Discharge Pipe Replacement
Post-Bid
Johns Island, SC 29455

Sewer Line CCTV Services
Results
North Charleston, SC 29405

Watkins Road Force Main Rehabilitation
Post-Bid
North Charleston, SC 29405

Rivers Point Row Storm Drain Rehabilitation Project
Results
Less than $43,220 est. value
Charleston, SC 29401

Ocean Boulevard Pipe Repair
Post-Bid
North Charleston, SC 29405

Northside Drive Pump Station Elimination
Results
North Charleston, SC 29419

Reported 02/08/2019 12:00 AM
Project Title

JIPSD Phase-1, Group-A, Service Area Wastewater Collection Rehabilitation Project

Physical Address View project details and contacts
City, State (County) James Island, SC   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 01/14/19
Owner View project details and contacts
Architect View project details and contacts
Description The Work includes providing all labor and materials for CIPP lining and repair of the existing 8" diameter sewers within designated public Rights-of-way on James Island. The work includes the cleaning, televising, inspection, and CIPP lining of approximately 4,600 ft of existing 8" diameter sewers and designated repairs and lining of approximately 117 vertical feet of existing manholes. Work will also include open-trench spot repairs of sewers determined to be too damaged to be rehabilitated by CIPP lining based upon analysis of televised inspection results.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents