Similar Projects
Repair Runway Pavements
Design
$25,000,000 to $100,000,000 est. value
East Gaffney, SC

Southern Parallel Taxiway Rehabilitation
Infrastructure
Bidding
Bennettsville, SC 29512

Main Apron Expansion – Phase 1
Infrastructure
Bidding
Orangeburg, SC 29115

Greenville Spartanburg International Airport (GSP) Airfield Pavement Improvements Program - Priority 1
Post-Bid
Greer, SC 29651

CHS Miscellaneous Airfield Pavement Repairs
Post-Bid
North Charleston, SC 29418

Ridgeland-Claude Dean Airport Runway 18-36 Program - Phases 3 and 4
Results
Ridgeland, SC 29936

Nebo Church Road Relocation and West Apron Expansion
Results
Less than $2,101,783 est. value
Seneca, SC 29678

Rubber Removal and Paint Stripping
Post-Bid
$1,000,000 to $5,000,000 est. value
North Charleston, SC

Airport Taxiway and Apron Reconstruction
Results
$250,000 to $500,000 est. value
Saluda, SC 29138

New Connector Taxiway Project
Post-Bid
Walterboro, SC 29488

Airport Apron Rehabilitation Project
Results
Lancaster, SC 29720

Runway 5 Safety Area Improvement Project
Post-Bid
SC

Taxilane and Apron Rehabilitation at Barnwell County Airport
Results
Barnwell, SC 29812

Hanger Taxilane Rehabilitation
Post-Bid
Chester, SC

Chester Catawba Regional Airport Taxiway Pavement Rehabilitation
Results
Less than $1,014,610 est. value
Chester, SC 29706

Last Updated 05/26/2021 08:41 AM
Project Title

Apron Reconstruction Project

Physical Address View project details and contacts
City, State (County) Manning, SC 29102   (Clarendon County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and reconstruction of asphalt apron at Santee Cooper Regional Airport. This bid project includes reconstruction of the asphalt apron at the Santee Cooper Regional Airport. The project will include removing approximately 11,000 SY of existing asphalt pavement, compacting existing base course to reuse, and paving 2,400 tons of asphalt. The project will also include full depth reconstruction in select areas and asphalt leveling course. In addition, the project will include new apron tie-downs, and new reflective pavement markings. Miscellaneous work items include demolition items, site grading and drainage, and erosion control.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents