Similar Projects
Reported | 03/11/2022 12:00 AM |
Project Title | ANR FWL Front Line Rearing Ponds Improvements |
Physical Address | View project details and contacts |
City, State (County) | Bennington, VT 05201 (Bennington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Constructing new concrete training walls around the first pond, pond #1 of the 4 front line rearing ponds, replacing a concrete water level control structure, flume, between pond #1 and pond #2. Repairing the concrete apron at the outlet of the concrete raceways at the upstream end of pond #1. The new concrete water level control structure, flume, will include a new drain to be connected to the main drain line for the hatchery facility. The new concrete training walls, replacement water level control structure, flume and drain are to improve operations and maintenance of the ponds. The existing concrete apron at the outlet of the concrete raceways is in very poor condition and in need of repair. In addition, the project will include a new bypass system and drain for the concrete headbox at the upstream end of the existing concrete raceways to improve operations and maintenance of the headbox. The project will also include erosion prevention and sediment control measures, cofferdams and control of water systems, piping, valves, earthwork and all other appurtenances and incidental work necessary to complete the project. This is a rebid of a larger project that included new concrete training walls around all 4 front line rearing ponds and new water control structures, flumes, between all the ponds. The revised project includes the headbox bypass system and drain, repairs to the concrete apron at the outlet of the concrete raceways, concrete training walls around pond #1, a new flume between ponds #1 and #2 and the associated drain. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |