Similar Projects
Clif Reynolds Road Culvert Replacement
Infrastructure
Bidding
$300,000 to $400,000 est. value
Cambridge, VT 05464

Andrews Road Culvert Replacement
Infrastructure
Bidding
$200,000 to $300,000 est. value
Cambridge, VT 05464

Garvin Hill Road and Grout Road Project
Infrastructure
Post-Bid
$25,000 est. value
Hartland, VT

Chester TAP TA17(9)
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Chester, VT

North Troy LPOE Site Civil Repairs
Results
North Troy, VT 05859

Proposed Densmore Drive Culvert Replacement
Results
$900,000 to $1,200,000 est. value
Essex, VT

Colchester HES NH 5600(14) C/1
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Winooski, VT

Town Line Road Culvert Replacement
Infrastructure
Post-Bid
Mendon, VT 05701

Beanville Road Culvert Replacement
Results
Randolph, VT 05060

Lottery Lane Box Culvert
Infrastructure
Bidding
Weathersfield, VT 05151

Davis Road Box Culvert
Infrastructure
Post-Bid
Royalton, VT 05063

Lewis Creek Streambank Repair Off Ireland Road
Results
$30,200 est. value
Bristol, VT

Bovat Road Culvert Replacement
Infrastructure
Post-Bid
Georgia, VT 05478

SFY2021 Deer Brook Gully Stabilization and Stormwater Mitigation Project
Results
Less than $400,000 est. value
Georgia, VT

Culvert Replacement
Infrastructure
Post-Bid
Pomfret, VT

Reported 03/11/2022 12:00 AM
Project Title

ANR FWL Front Line Rearing Ponds Improvements

Physical Address View project details and contacts
City, State (County) Bennington, VT 05201   (Bennington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing new concrete training walls around the first pond, pond #1 of the 4 front line rearing ponds, replacing a concrete water level control structure, flume, between pond #1 and pond #2. Repairing the concrete apron at the outlet of the concrete raceways at the upstream end of pond #1. The new concrete water level control structure, flume, will include a new drain to be connected to the main drain line for the hatchery facility. The new concrete training walls, replacement water level control structure, flume and drain are to improve operations and maintenance of the ponds. The existing concrete apron at the outlet of the concrete raceways is in very poor condition and in need of repair. In addition, the project will include a new bypass system and drain for the concrete headbox at the upstream end of the existing concrete raceways to improve operations and maintenance of the headbox. The project will also include erosion prevention and sediment control measures, cofferdams and control of water systems, piping, valves, earthwork and all other appurtenances and incidental work necessary to complete the project. This is a rebid of a larger project that included new concrete training walls around all 4 front line rearing ponds and new water control structures, flumes, between all the ponds. The revised project includes the headbox bypass system and drain, repairs to the concrete apron at the outlet of the concrete raceways, concrete training walls around pond #1, a new flume between ponds #1 and #2 and the associated drain.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents