Similar Projects
Milam Elementary School Parking Lot Addition & Improvements
Post-Bid
Tupelo, MS 38804

Old Foxworth Road Repair
Post-Bid
Columbia, MS 39429

Mill, Overlay and Stripe Approximately 2 Miles on I-69 from the Concrete Section to Tennessee State Line
Results
MS

Intersection Improvements at Various Locations Throughout the District 6
Infrastructure
Results
MS

2021 Street Overlay Summer
Post-Bid
Mississippi State, MS

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

L and L Park Trail Construction Recreation Trails Program
Post-Bid
New Hebron, MS

Hot Mix Asphalt Overlay on Various Roads
Results
$3,145,212 est. value
Hernando, MS

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

Road Widening
Results
$1,150,000 est. value
Hernando, MS

Grenada County Reclamation, Soil Cement, & D.B.S.T Roads "A" Thru "X"
Post-Bid
MS

Andrew Chapel Road Reconstruction
Results
$3,700,000 est. value
MS 22554

Micro Surfacing
Post-Bid
Meridian, MS

2020 New Concrete Parking
Results
$209,994 est. value
Picayune, MS

MSU 2021 Parking Lot Improvements
Post-Bid
Mississippi State, MS

Last Updated 08/30/2022 06:03 AM
Project Title

Center Street South Improvements

Physical Address View project details and contacts
City, State (County) Senatobia, MS 38668   (Tate County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes road improvements on Center Street from Tate Street to Gabbert Park, which includes paving, curb and gutter, and sidewalks. Also, the Gabbert Park parking lot is to be repaved and an A.D.A. ramp build at the southwest corner of Front and Main Street. Contract time is 90 working days. Contractor shall commence work on or before a date to be stipulated in the Notice to Proceed. The contract will be awarded to the lowest and/or best bid from a responsive responsible and qualified Bidder. Should no award be made within forty-five (45) calendar days after opening of proposals, all proposals may be rejected and all proposal guaranties returned, unless the lowest responsive responsible qualified bidder, at the request of the Owner, agrees in writing to a longer delay. Bid bond, signed or countersigned by a Licensed Mississippi Agent, or Mississippi Non-Resident Agent licensed to do business in the State of Mississippi, with Power of Attorney attached, or Cashier's check or Certified check for five percent (5%) of the total bid, payable to the City of Senatobia, must accompany each proposal. Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid, and such proposals may not be considered in making the award. City of Senatobia reserves the right to waive any irregularities and to reject any and all bids if considered not in the best interest of the City of Senatobia.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents