Similar Projects
Heron Ridge Residential Development - Phase 3
New Construction
Conception
$18,000,000 est. value
Nampa, ID 83686

Black Butte Business Park Phase 3 / Nampa
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Nampa, ID 83687

Terrace Falls Subdivision
New Construction, Infrastructure
Design
$37,956,488 CJ est. value
Nampa, ID 83686

Falcon Townhouses Subdivision
New Construction - 339,768 SF
Design
$10,000,000 est. value
Nampa, ID

RFP - North West Triangle Hangar Development
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Caldwell, ID 83605

RFP - NE Rectangle Hangar Development
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Caldwell, ID 83605

2022, Ustick Road Widening, Ashton Avenue to I-84
Infrastructure
Post-Bid
$260,000 CJ est. value
Caldwell, ID 83687

Canyon Village Apartments / Caldwell
New Construction, Infrastructure - 13,866 SF
Post-Bid
$100,000,000 CJ est. value
Caldwell, ID 83607

2nd and 4th Street North Waterline Replacement Project FY22
Infrastructure
Results
$1,190,010 CJ est. value
Nampa, ID 83651

I-84 Galloway Rd Repair, I-84 Robinson and I-184 Orchard
Infrastructure
Results
$993,418 CJ est. value
Caldwell, ID 83607

Broadstone Townhouses
New Construction
Construction
$10,000,000 est. value
Nampa, ID 83686

Sonata Pointe West Townhomes - Phase 2
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Nampa, ID 83651

McDermott Road Industrial
New Construction, Infrastructure - 703,300 SF
Pending Verification
$378,000,000 CJ est. value
Nampa, ID 83687

Happy Valley Townhomes
New Construction
Design
$18,000,000 est. value
Nampa, ID 83687

2022, Ustick Road Roundabouts: Ustick/Florida and Ustick/Indiana
Infrastructure
Bidding
$700,000 CJ est. value
Caldwell, ID 83605

Last Updated 11/18/2022 08:39 AM
Project Title

RFQ D/B - OAU Stepdown Housing, SWITC: Demolition Phase, Nampa, Idaho

Physical Address View project details and contacts
City, State (County) Nampa, ID 83687   (Canyon County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All questions must be sent to the DPW Project Manager: Nicole Cecil, Project Manager Division of Public Works | 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208) 332-1905 nicole.cecil@adm.idaho.gov DESCRIPTION OF PROJECT The Division of Family and Community Services has been allocated general funds for the demolition of several buildings on the Southwest Idaho Treatment Center (SWITC) campus that have not been used for some time and are beyond repair. There will be a future phase the construction of an Observation and Assessment Unit and Step-Down Housing on this campus, however, the demolition of the existing buildings is a priority at this time. The scope of the project is to identify utilities and existing building foundations. Accurate documentation of existing site conditions is necessary. Determine the existing utility connections that should be pulled back (close to buildings) and/or terminated. Any utilities that require shut down will need to be documented clearly and coordinated for the least impact to adjacent buildings that will remain in operation. Demolition will include removal of debris to an approved site, tearing out foundation, and stripping utilities. Each site should receive clean backfill or structural backfill with the finished surface matching the adjacent areas surrounding the building site. Owner will be responsible for providing the most up-to-date drawings available for each building, survey of hazardous materials, soils testing, and third-party asbestos abatement during demolition. The Owner also has a memorandum summary of the water rights for the property and adjacent City of Nampa golf courses. All other surveys and testing will be the responsibility of the Design-Build Team.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents