Apartments/Condominiums, Site Development Construction Project Lead, Nampa, ID 83687 (Canyon County)
Last Updated | 11/18/2022 08:39 AM |
Project Title | RFQ D/B - OAU Stepdown Housing, SWITC: Demolition Phase, Nampa, Idaho |
Physical Address | View project details and contacts |
City, State (County) | Nampa, ID 83687 (Canyon County) |
Category(s) | Heavy and Highway, Residential |
Sub-Category(s) | Apartments/Condominiums, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All questions must be sent to the DPW Project Manager: Nicole Cecil, Project Manager Division of Public Works | 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208) 332-1905 nicole.cecil@adm.idaho.gov DESCRIPTION OF PROJECT The Division of Family and Community Services has been allocated general funds for the demolition of several buildings on the Southwest Idaho Treatment Center (SWITC) campus that have not been used for some time and are beyond repair. There will be a future phase the construction of an Observation and Assessment Unit and Step-Down Housing on this campus, however, the demolition of the existing buildings is a priority at this time. The scope of the project is to identify utilities and existing building foundations. Accurate documentation of existing site conditions is necessary. Determine the existing utility connections that should be pulled back (close to buildings) and/or terminated. Any utilities that require shut down will need to be documented clearly and coordinated for the least impact to adjacent buildings that will remain in operation. Demolition will include removal of debris to an approved site, tearing out foundation, and stripping utilities. Each site should receive clean backfill or structural backfill with the finished surface matching the adjacent areas surrounding the building site. Owner will be responsible for providing the most up-to-date drawings available for each building, survey of hazardous materials, soils testing, and third-party asbestos abatement during demolition. The Owner also has a memorandum summary of the water rights for the property and adjacent City of Nampa golf courses. All other surveys and testing will be the responsibility of the Design-Build Team. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |