Similar Projects
Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Munchkin Extension/Multi Trail and Woodbine Improvement - CP0528 - City of Park City
Infrastructure
Conception
$1,858,825 CJ est. value
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

RFP - Mine Bench Workforce Housing Development
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Park City, UT 84060

Drilling and Installation of an Agricultural Well at the Kamas Cemetery
Infrastructure
Bidding
$210,000 CJ est. value
Kamas, UT 84036

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

Clark Ranch Project
Infrastructure
Post-Bid
Park City, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

Iron Horse Complete Street Improvements - CP0547 - City of Park City
Infrastructure
Conception
$2,500,000 CJ est. value
Park City, UT 84060

Drilling and Installation of an Agricultural Well at the Francis Cemetery
Infrastructure
Bidding
$80,000 CJ est. value
Kamas, UT 84036

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Franklin Spring Rehabilitation Project
Infrastructure
Results
$157,000 est. value
Henefer, UT

Last Updated 01/13/2023 05:03 PM
Project Title

RFQ Contractor - Rockport State Park New Culinary Well

Physical Address View project details and contacts
City, State (County) Peoa, UT 84061   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $230,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

* You must complete the mandatory prerequisites before you can view all the details of this event. https://dfcm.utah.gov/ Project Description: The WORK consists of drilling, constructing, developing, and testing the proposed Rockport Replacement Well. As part of the WORK, the CONTRACTOR shall: o Drill for and install a 14-inch diameter surface casing to a depth of 40 feet; o Install certified cement grout around the 14-inch diameter surface casing; o Conduct air-lift tests during drilling to assess yield and water quality characteristics; o Geophysical log boring; o Install an 8-inch diameter production casing and well screen assembly; o Install gravel pack and a certified cement grout well seal around the production casing and well screen assembly; o Develop and pump test the well; and o Perform other tasks as directed by the ENGINEER and described in these Technical Specifications and the Contract Documents. QUESTIONS DEADLINE MONDAY, NOVEMBER 14, 2022 3:00 PM Utah Public Procurement Place (U3P)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents