Similar Projects
Central Plaza Shopping Center
New Construction, Renovation, Demolition
Conception
$20,000,000 to $25,000,000 est. value
Camarillo, CA 93010

Capital Commerce Center
New Construction, Demolition - 1,100,000 SF
Conception
$30,000,000 est. value
Sacramento, CA 95824

Freedom West Residential Development Master Plan PPP
New Construction, Build-Out
Design
$1,000,000,000 est. value
San Francisco, CA 94102

Easton Research Park West Sitework and Demolition
Demolition
Design
Rancho Cordova, CA 95742

Monte Vista Terrace Demolition and New Office
New Construction, Demolition
Bidding
Fresno, CA 93701

FEMA Region 9 Lateral File and Records Room Demolition
Demolition
Post-Bid
Oakland, CA 94607

111 Ralston Ridge Residential Structures Demolition and Abatement
Demolition
Post-Bid
Boulder Creek, CA 95006

Parkmoor Demolition
Demolition
Results
$770,000 est. value
San Jose, CA 95126

On Call Demolition (Non-Emergency)
Term Contract
Results
Sacramento, CA

The Bellwood
New Construction, Demolition - 241,754 SF
Pending Verification
$10,000,000 CJ est. value
Los Angeles, CA 90064

Holiday Inn Apartment Conversion
Renovation, Demolition
Pending Verification
$3,000,000 est. value
Sacramento, CA 95814

CLA Tower And Registration Buildings Demolition Project
Demolition, Infrastructure
Post-Bid
$9,068,000 est. value
Pomona, CA 91768

Demolition Of Former R.H. Dana Middle School
Infrastructure
Results
El Segundo, CA 90245

Garden Alameda Apartments
New Construction - 7,700 SF
Pending Verification
San Jose, CA 95126

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Post-Bid
$750,000 to $950,000 est. value
Palm Springs, CA 92264

Last Updated 01/21/2022 12:01 AM
Project Title

CDE Pool Demolition

Physical Address View project details and contacts
City, State (County) Fremont, CA   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $789,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project comprises labor, material and services necessary for demolition of in-ground swimming pool, fencing, associated pool equipment and pool deck. Remove small metal building, remove electrical panels, light poles & concrete footings. Install new conduits & wiring, place compacted backfill to fill the void. Install irrigated turf grass, concrete curb, and place bark

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents