Similar Projects
Hwy. 349 - Hwy. 63 (S)
Infrastructure
Bidding
$4,000,000 est. value
Hoxie, AR 72433

Hwy. 63B West - Greene Co. Line (S)
Infrastructure
Bidding
$4,000,000 est. value
Hoxie, AR 72433

2021 Asphalt Overlay Program
Post-Bid
Sherwood, AR

Hot Mix On Specified County Roads
Infrastructure
Post-Bid
AR

Street Improvements
Results
McGehee, AR

Trumann and Weiner Overlay and Surfacing
Results
Weiner, AR

Moorefield - Hwy. 122 (S)
Infrastructure
Bidding
$4,000,000 est. value
Batesville, AR 72522

Seal Coating and Re-Striping of the Parking Lot at Arvest Ballpark
Infrastructure
Post-Bid
Springdale, AR 72762

Hwy. 135 - CR 639 (Overlay & Surf.)
Results
AR

Hwy. 1 - Hwy. 130 (S)
Infrastructure
Bidding
$4,000,000 est. value
Stuttgart, AR 72160

Shoot Range Backstop Paving
Infrastructure
Post-Bid
Jacksonville, AR

Hwy. 365 - Patsy Rd
Results
AR 72132

Snow Lake - Elaine (S)
Infrastructure
Bidding
$4,000,000 est. value
Crumrod, AR

Hope 6th St. Reconstruction
Infrastructure
Post-Bid
Hope, AR

Sevier Street - Geyer Springs Road (CONC PVMNT PRES)
Infrastructure
Results

Last Updated 04/28/2022 06:17 AM
Project Title

2022 Bond Overlay Projects

Physical Address View project details and contacts
City, State (County) Cabot, AR 72023   (Lonoke County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major improvements for the project will consist of the following: overlay the following streets: 1. Elk Bear Lane from Timberwood Drive to Tacoma Drive 2. Glendale Drive from East Mountain Springs Road to cul-de-sac, and Woodhaven Drive from Glendale Drive to north of Glendale Cove 3. W. Cherry Street from North 2nd Street to end of road 4. Richie Road from South 1st Street to Murray Drive 5. Kirkland Drive from State Highway 5 to cul-de-sac 6. Gleneagle Drive from Greystone Blvd to cul-de-sac 7. Kerr Station from South Adams Street to Campground Road 8. E. Main Street from North Adams Street to S. Pine Street 9. Oak Meadows Drive in its entirety 10. Barnwell Drive from Pond Street to Oak Meadows Drive (south), then from Oak Meadows (south) to Oak Meadows (north) 11. Meadowlark Drive in its entirety 12. Robinson Street from Oak Meadows Drive to Meadowlark Drive (east) 13. Jay Circle in its entirety 14. Pear Street, Liberty Street, and Sycamore Street in their entireties 15. Spence Street from Pond Street to Pear Street 16. Pheasant Run Drive and Paige Avenue in their entireties 17. Sandy Avenue from South2nd Street to Old Highway 67 18. Greystone Boulevard from State Highway 5 to cul-de-sac

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents