Similar Projects
Milford Exempted Village Schools Bond Proposal
New Construction, Renovation, Demolition
Conception
$98,000,000 est. value
Milford, OH 45150

Paul Brown NFL Stadium
Renovation
Conception
Cincinnati, OH 45202

Lincoln Field Restoration
Renovation
Design
$800,000 to $1,000,000 est. value
Marion, OH 43302

Amphitheater Project
New Construction
Design
Fremont, OH 43420

Show Arena Building Addition Project
Addition
Bidding
Wapakoneta, OH

Lincoln Park Stadium Restoration and Rehab Project
Post-Bid
Less than $300,000 est. value
Marion, OH 43302

Concrete and Coating Repairs to Mckinley High School Stadium
Renovation
Post-Bid
Sebring, OH 44672

Hamilton County East Garage Steel Overcoating and Repairs Project
Results
$175,000 est. value
Cincinnati, OH 45202

Lee R. Jackson Field Baseball Stadium
Results
Less than $400,000 est. value
Akron, OH 44325

Greater Dayton School - Private PK-8 Elementary School
New Construction
Conception
$35,000,000 est. value
Dayton, OH 45402

Owner's Representative Services
New Construction
Post-Bid
$12,000,000 est. value
Dayton, OH 45417

Stadium Repair Project
Results
Less than $140,000 est. value
Dayton, OH

Capital Improvements - Construction Manager at Risk
Renovation
Post-Bid
$4,300,000 est. value
Kirtland, OH 44094

New Grandstand and Press Box
Results
Less than $400,000 est. value
Bridgeport, OH 43912

Stadium Field House
Results
Less than $1,421,927 est. value
Bay Village, OH 44140

Reported 11/02/2021 11:10 AM
Project Title

Home Side Grandstand Replacement

Physical Address View project details and contacts
City, State (County) North Canton, OH   (Stark County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of removal and replacement of the home side, center concrete/steel bleacher system including all construction beneath. A new bleacher system will be provided and installed by the owner. Construction of new locker rooms, public restrooms (beneath the bleachers) and all site / utility improvements will be the responsibility of the selected contractor. Selected contractor to coordinate all work with bleacher installation contractor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents