Similar Projects
New Route 1 Elementary School
New Construction
Conception
$21,169,348 est. value
Fort Belvoir, VA

Lees Corner Elementary School Renovations
Renovation
Conception
$35,998,583 est. value
Fairfax, VA 22033

New Elementary School
New Construction - 104,000 SF
Design
Goochland, VA

Greenbrier Elementary Media Center Modernization
Renovation
Bidding
Charlottesville, VA 22901

St. Theresa Catholic School - Electrical Upgrades
Addition
Post-Bid
Ashburn, VA 20147

Rosemount Lewis Elementary School
New Construction - 129,829 SF
Results
Less than $36,980,000 est. value
Manassas, VA 20109

Security Vestibule Renovations - Sterling Elementary School, Guilford Elementary School and Sully Elementary School
Renovation
Results
Sterling, VA 20164

Construction, New Crestwood Elementary School
New Construction - 95,944 SF
Construction
Richmond, VA 23225

Construction of Elementary School (Hovatter)
New Construction - 110,400 SF
Construction
VA

Armstrong Elementary School Renovations
Renovation
Conception
$31,009,612 est. value
Reston, VA 20194

Kitchen and Entrance Renovations to Key Elementary School
Renovation - 3,754 SF
Results
Arlington, VA 22201

McHarg Elementary School Additions and Renovations Project
Renovation, Addition - 75,600 SF
Construction
Radford, VA

Cub Run Elementary School Renovations
Renovation
Conception
$36,515,343 est. value
Centreville, VA 20120

Agnor Hurt and Greer Elementary Schools Restroom Finishes Upgrades
Renovation
Results
$200,000 to $250,000 est. value
Charlottesville, VA 22901

Crozet Elementary School Addition, Renovations and Site Improvements Part II
Renovation, Addition - 70,000 SF
Construction
$15,000,000 to $16,000,000 est. value
Crozet, VA 22932

Last Updated 03/29/2022 01:01 PM
Project Title

Entry Modifications at 6 Middle Schools

Physical Address View project details and contacts
City, State (County) Hamilton, Leesburg, Purcellville, VA 20176   (Loudoun County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project currently consists of the simultaneous renovation of the entry vestibules and main offices of six middle schools- Belmont Ridge Middle School, Blue Ridge Middle School, Harmony Middle School, Harper Park Middle School, J. Lupton Simpson Middle School and Smart’s Mill Middle School. 2.These six school renovations may each have differing scopes of work. These scopes of work may include, but are not limited to: Main entry frame and door installations and modifications; Interior vestibule frame and door installations and modifications; Main office renovations; Restroom relocations; Lighting installations and modifications; Security installations and modifications; Communications and Data installations; Lobby area renovations; Fire Alarm system installations and modifications; Fire Sprinkler system installations and modifications; Electrical installations and modifications Interior Storefront installations and modifications; Door Hardware installations and modifications; Security System installation and modification; Glass and Glazing installations and modifications; Flooring installations and modifications; Hazardous Materials Abatement; and Ceiling installations and modifications.

Details

Elementary School, Renovation.
Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Metal Fabrications, Metal Railings, Pipe and Tube Railings.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Plastic Fabrications.
Division 07 - Thermal and Moisture Protection, Thermal Protection, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Door Hardware, Glazing.
Division 09 - Finishes.
Division 10 - Specialties, Visual Display Units, Signage, Wall and Door Protection, Corner Guards.
Division 12 - Furnishings, Window Shades.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents