Similar Projects
Waters Edge at University Place - Phase 1
New Construction - 182,000 SF
Design
$10,000,000 CJ est. value
Charlotte, NC 28262

Demolition - 4155 St. Paul’s Church Road
Demolition
Post-Bid
Morganton, NC 28655

Caswell Square Building Demolition
Demolition
Post-Bid
Raleigh, NC

P--Demolish Central Heating Plant, Steam Piping, and Steam Pits, MCBCL and MCASNR
Demolition
Results
$5,000,000 to $10,000,000 est. value
Camp Lejeune, NC

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC

UNC Curtis Media Demolition of Phillip's Annex
Demolition
Construction
Chapel Hill, NC 27514

Kaleideum Site Demolition
Demolition
Construction
Winston-Salem, NC 27101

Demolition and Clearance Round #2 for Hazard Mitigation Grant Program (HMGP)
Demolition
Post-Bid
Pinetops, Princeville, Tarboro, NC 27864

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC

Demolition and Clearance Round #1 for Hazard Mitigation Grant Program (HMGP)
Post-Bid
Pinetops, NC 27864

NCSU DH Hill Sitework Improvements
Results
Less than $381,400 est. value
Raleigh, NC 276957520

Demolition and Clearance Project
Demolition
Post-Bid
Hamlet, NC 28345

Demolition of 408 Hudson Street
Results
Greenville, NC 27834

State Disaster Recovery Act Single-Family Home Construction Project No. 5
Demolition
Post-Bid
Richlands, Swansboro, NC

Demolition Services
Demolition
Results
Less than $65,390 est. value
Raleigh, NC

Last Updated 12/09/2020 03:16 PM
Project Title

Tabor City Pre K-8th Grade School, Phase One

Physical Address View project details and contacts
City, State (County) Tabor City, NC 28463   (Columbus County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major project elements include abatement of materials reported in the attached materials investigation report and demolition of all existing buildings on the site (except the historic one room schoolhouse that is fenced separately). The southwest classroom and cafeteria building will be used by the owner during construction and will be removed in the contract after the school building is accepted for occupancy. The building pad will require substantial soils remediation immediately following the demolition phase, owing to the liquefaction potential of the site. The process is described in these contract documents. The general scope of soils remediation includes removal of unsuitable soils within and adjacent to the building pad, installing earthquake drains across this area, surcharging the area with suitable soils to a specified depth, allowing the soils to subside until they will support the building foundation. Removal of excess soil will be under a separate contract.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents