Similar Projects
Pond and Drainage System Construction
Bidding
De Pere, WI

Flooding Repairs - Waisman Center
Bidding
Less than $136,000 est. value
Madison, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Approach Channel Entry and Rescue Upgrades
Bidding
Milwaukee, WI

Concrete Culverts
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

River Bend Park Improvements
Bidding
Grafton, WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Lakeview Drive and Beach Drive Ditch Reconstruction Project
Bidding
Lake Ripley, WI 53523

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Shoreline Stabilization
Results
Oconomowoc, WI 53066

Last Updated 10/16/2020 07:59 AM
Project Title

South Fork Pheasant Branch Creek Repairs to Channel

Physical Address View project details and contacts
City, State (County) Madison, WI 53562   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails the stabilization of approximately 2,000 feet of stream banks along an approximately 2,300-foot reach of South Fork Pheasant Branch that suffered damaged due to the August 2018 and various 2019 flood events. The work includes stabilizing stream banks using bioengineered treatments comprised of vegetated reinforced soil slope (VRSS) soil lifts on root wad toe wood (approximately 260 feet) or VRSS soil lifts on riprap toes (approximately 300 feet), as well as riprap (1,050 feet) and grading (approximately 270 feet)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents