Similar Projects
Milwaukee Federal Building and US Courthouse Fire Life Safety Construction Manager as Constructor (CMc)
Design
$5,000,000 to $10,000,000 est. value
Milwaukee, WI 53202

Engineering Hall Sprinkler and Gas Piping-Phase 1 - GPC
Infrastructure, Alteration
Bidding
$3,500,000 est. value
Madison, WI 53706

Testing of Fire Alarm System
Term Contract, Alteration
Bidding
Madison, WI 53705

Testing, Repairing and Recharging Fire Extinguishers and Fire Suppression Systems at Various MPA Schools
Term Contract
Post-Bid
Milwaukee, WI 53208

Milwaukee Fire Life Safety CMc
Post-Bid
$8,000,000 to $10,000,000 est. value
Milwaukee, WI 53202

Training Kitchen Fire Suppression and Exhaust Replacement
Results
Less than $232,000 est. value
Oshkosh, WI 54901

Fire Alarm Panel Replacement
Results
Less than $72,000 est. value
Madison, WI 53703

Maintenance- Fire Protection Systems
Term Contract
Post-Bid
Milwaukee, WI

Statewide Barracks Fire Sprinkler Retrofit Phase II
Results
Less than $200,000 est. value
Fox Lake, WI 53933

Westnor Apartments Fire Alarm Replacement
Post-Bid
Fond du Lac, WI 54935

Central Maintenance Facility Fire Alarm and Lighting Upgrades
Results
Eau Claire, WI 54703

Kenosha County Brookside Care Center Fire Protection Piping Replacement
Alteration
Post-Bid
Kenosha, WI 53144

Fire Alarm System Replacement
Results
Less than $62,000 est. value
Madison, WI 53703

Repair Bulk Oxygen Alarm System
Renovation, Term Contract
Post-Bid
$25,000 to $100,000 est. value
Tomah, WI 54660

Fire Protection System
Results
Waterford, WI 53185

Reported 11/17/2021 07:41 AM
Project Title

Install Fire Suppression System -GPC

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value $2,440,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of Directional drilling a new 10 inch water service to the building, installing sprinkler and high-expansion foam fire suppression systems in an approximate 58,000 square foot aircraft hangar building. Other work involved will include installation of of fire pumps, construction of a fire suppression equipment room within the existing building mechanical space, upgrading the existing fire alarm system, installing a new building service served by a new transformer and adding supplementary structural steel framing to support the new fire suppression systems. Part of the work of this project will need to be coordinated with the work of a separate project that will construct two small additions for hangar doors concurrent with the work of this project.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents