Similar Projects
Old Firehouse Renovation CM Services
Renovation
Bidding
Raymond, NH

Belmont Police Department
New Construction
Post-Bid
Belmont, NH 03220

Construction Manager Services - Fire Station 3 Addition and Renovations
Renovation, Addition - 9,600 SF
Results
Less than $1,300,000 est. value
Nashua, NH

Owner’s Project Management (OPM) Services for Fire Station Design and Construction
Results
North Conway, NH

Remodel Ashuelot Fire Station
Renovation
Results
Ashuelot, NH 03441

Design and Construction Services - Public Safety Facility
Results
Bristol, NH 03222

2020 Fire Department Bathroom Plumbing Renovations
Renovation
Results
Belmont, NH

Construction Management Services - Police Station
New Construction - 8,500 SF
Results
Belmont, NH

Amherst Police Department Remodel
Renovation - 11,040 SF
Results
Amherst, NH 03031

Renovation Police Department and Town Hall
Renovation - 900 SF
Results
Brentwood, NH 03833

Design Build - Fire Station Addition
Addition
Results
Derry, NH

Fire Station New Addition and Interior Work
Addition
Results
Newington, NH

Addition and Renovation of the Existing Fire Station
Renovation, Addition
Results
Surry, NH 03431

Fire Department Hall Project
Results
Epsom, NH 03234

Construction Management Services, New Construction Project, Tuftonboro Police Station
New Construction - 5,000 SF
Results
Less than $1,740,000 est. value
Tuftonboro, NH

Last Updated 11/19/2020 09:10 AM
Project Title

Patrol Room Project

Physical Address View project details and contacts
City, State (County) Allenstown, NH 03275   (Merrimack County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove one (1) Steel door and all its related hardware, including a hardwired electrical unlocking switch. 2. Reinstall the above door with all its related hardware, including its hardwired electrical unlocking switch within the same lobby area. 3. Stud, dry wall, and paint the original door opening. 4. Build a 46" tall "L-shaped" wall, approximately 18' in total length. (12'x6') 5. Wall shall be capped by a finished wood top. 6. Wall shall include two (2) gang electrical outlets (4 outlets at each location) every 4 feet to include at least three (3) separate locations. 7. In interview room, two (2) double gang outlets shall be installed. 8. In interview room, wall shall be repaired and ready to be painted. 9. A light shall be installed in the lobby area to show that the interview room light is on.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents