Similar Projects
Last Updated | 12/27/2023 03:05 PM |
Project Title | 2000 San Pablo Tenant Improvements (Phase 2) |
Physical Address | View project details and contacts |
City, State (County) | Oakland, CA 94612 (Alameda County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected February 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Tenant improvement modifications to the existing office building located at 2000 San Pablo Ave in Oakland, California. The scope of work will focus on the repurposing of space and increasing workstation quantities on the second and third floors of this occupied facility. Included in these services will be full re-cabling of voice/data infrastructure, associated mechanical, electrical, life safety, LEED, commissioning, security, telecommunications, low voltage, and new interior furniture installation. Floor coverings will also be replaced. Each of these floors is approximately 27,000 square feet with work to be phased on a floor-by-floor basis, as negotiated with the Social Services Agency stakeholders and GSA. To bid on this Project, the Bidder is required to possess the following State of California Contractor Licenses: B Contractors License A bid bond by an admitted surety insurer on the form provided by the County, cash, or a cashier's check or a certified check, drawn to the order of the County of Alameda, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the County for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. Question Deadline 10/02/2023 The project scope consists of tenant (Social services Agency) improvement modifications to the existingofficebuilding located at 2000 San Pablo Ave in Oakland California. The scope of work will focus on the repurposingofspace and increasing workstation quantities on the second and third floors of this occupied facility. Eachfloor isapproximately 27,000 square feet. This scope shall include: 2nd Floor - Create new meeting space that adjacent to office 256 that will require: o New ceiling grid height wall from office 252 extending to exterior wall o New card reader and door to match existing finishes to be installed adjacent to office 252 - Enclose the existing break room 254 which will require: o Building a new 7 foot wall o New door 6'5"with card reader 3rd Floor -Demolition of office space walls to expand office numbers 355, 354, and 353 into one large narrowroomtoaccommodate4workstations. - Review furniture plan and insure proper code clearances for safety corridors are met - Review reflective ceiling plan for new enclosed spaces document all necessary changes to meet all code complianceforlightingand ventilation and fire life safety 2 nd and 3 rd Floor o Electrical/data through new workstations, new carpet, and complete painting 1 st & 4 th Floors o New flooring and painting |
||||||||||||||||||||||||||||||||
Details | 27,000 SF.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |