Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

Construct Park and Ride Area
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Tyndall AFB, FL

Shingle Creek Regional Trail Phase 1, Segment 2 (from S.R. 528 to Destination Parkway)
Infrastructure
Bidding
$5,709,711 est. value
FL

Parking Lot Renovations and Restoration at Various Charter Schools
Alteration
Bidding
$300,000 est. value
Pembroke Pines, FL

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Post-Bid
Less than $700,000 est. value
Fort Lauderdale, FL

Concrete, Brick and Mortar Repair and Replacement
Term Contract
Post-Bid
Saint Pete Beach, FL 33706

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Amazon Delivery Station
Build-Out, Infrastructure - 120,282 SF
Pending Verification
Riviera Beach, FL 33404

Cemetery Parking Lot Paving And Sealing
Alteration
Bidding
Immokalee, FL 34142

46th Avenue Recreational Trail
Post-Bid
$561,393 to $562,923 est. value
Kenneth City, FL

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

Sidewalk Repair
Infrastructure
Bidding
$53,497 est. value
FL

Saratoga Apartments Outer Parking Lots Renovations
Post-Bid
Saint Petersburg, FL 33713

Devilliers Street Revitalization, Phase 1: from Main Street to Garden Street
Results
Pensacola, FL

Last Updated 10/07/2021 03:38 AM
Project Title

NW Peacock Boulevard - Concrete Sidewalk Repair and Replacement

Physical Address View project details and contacts
City, State (County) Saint Lucie West, FL 34986   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials necessary to demolish, remove and replace deficient 8-foot-wide sidewalk, curbing and curb ramps along NW Peacock Boulevard between NW California Boulevard and NW Cashmere Boulevard. Also, sections of existing sidewalk which do not currently have joints shall be sawcut at 5’ intervals to match adjacent sidewalk.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents