Similar Projects
Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

Golden Hills Pump Station Rehabilitation
Results
$276,000 est. value
Cottonwood Heights, UT 84121

SLC WRF Influent Pump Rebuild Project
Post-Bid
Less than $369,000 est. value
Salt Lake City, UT

500 West Lift Station Rehabilitation
Results
$274,000 est. value
Salt Lake City, UT 84115

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

900 North Lift Station Rehabilitation
Results
Less than $1,257,000 est. value
Salt Lake City, UT 84115

Airport Pump Station Pump 5 and Motor Installation
Results
West Jordan, UT 84088

New Rose Park Lift Station Replacement (SS02)
Results
Less than $419,000 est. value
Salt Lake City, UT 84116

Rosecrest Pump Station Improvements Project
Results
Less than $998,000 est. value
Herriman, UT 84096

Reported 10/13/2020 12:00 AM
Project Title

Stonebridge Maintenance Variable Speed Pump Station Replacement

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84120   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To replace the variable speed water pump station at Stonebridge Golf Club, 4415 Links Drive, in West Valley City. Contractor will install new pump station skid and connect to existing culinary inlet pipe and existing outlet pipe. Contractor will connect to existing electrical power. Contractor will test new station and verify capabilities are met. West Valley City will install new roof. Existing wet well will be used. Existing wet well is 200” deep to skid deck and 7’ X 9’.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents