Similar Projects
Bridge St./Diagonal St./2nd St. Intersection Improvements
Infrastructure
Bidding
$1,800,000 CJ est. value
Clarkston, WA 99403

Walla Walla VAMC Water Tower Inspection and Cleaning
Term Contract
Sub-Bidding
Walla Walla, WA 99362

Block 24 Valve Box Replacement
Infrastructure
Sub-Bidding
$425,000 CJ est. value
Othello, WA 99344

Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, Washington
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bridgeport, WA 98813

District Drinking Water Outlet Mitigation
Alteration
Post-Bid
$50,000 est. value
Vancouver, WA

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

Hazen High School Pool Modernization
Alteration
Results
$9,100,000 est. value
Renton, WA

Mount Saint Helens Sediment Retention Structure Crest Raise
Infrastructure
Post-Bid
$25,000,000 CJ est. value
Toutle, WA 98649

Fountain Restoration Project
Alteration
Results
Fife, WA 98424

Methow Valley State Airport - Helipad Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Winthrop, WA 98862

2023 Sewer Main Replacement Project
Infrastructure
Results
$790,188 CJ est. value
Walla Walla, WA 99362

Digester Piping Materials Rebid
Term Contract
Post-Bid
$85,000 CJ est. value
Tacoma, WA 98405

Fruit Valley Road Stormwater Overflow
Infrastructure
Results
$599,995 CJ est. value
Vancouver, WA 98660

2022 Plumbing Unit Price Contract for Community Libraries
Term Contract
Post-Bid
Marysville, WA 98270

Mv Finest Drydocking and Repairs
Infrastructure
Results
$400,000 CJ est. value
Port Townsend, WA 98368

Last Updated 09/20/2023 07:08 AM
Project Title

Lift Station No. 2 Upgrades Rebid

Physical Address View project details and contacts
City, State (County) Manson, WA 98831   (Chelan County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $731,740 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed includes: structural modifications to the existing wet well; removal and installation of flow meter vault; replacement of existing pump and installation of new pump; installation and replacement of piping, valves, and fittings; replacement of pressure sensor assembly and flow meter; construction of retaining wall and fence; electrical and controls modifications for the lift station Estimated Range $450,000-$600,000 The Engineer's estimate of probable cost is $875,000 including WSST *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Construction, Sanitary Sewer (Gravity), Sewer Pump Station, Sewer Force Main, Electrical and Controls, Retaining Walls, Electrical Installation/Construction, Fittings and Valves, Fencing/Guardrails/Handrails, Grade and Surface, Excavation, Erosion Control - Temporary, Materials, Equipment and Supplies, Lift Stations/Lift Station Equipment, Mechanical Systems, Meter Vault Improvements, Sitework/Excavating and Grading, Water/Wastewater Infrastructure, Water and Wastewater Facilities

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents