Similar Projects
Sienna Pointe and Heackock Park Apartment Complexes Renovation
Renovation
Conception
$10,000,000 est. value
Moreno Valley, CA 92553

411 Apartments
New Construction - 383,000 SF
Conception
$10,000,000 CJ est. value
Los Angeles, CA 90012

AC Hotel by Marriott
New Construction
Design
Sherman Oaks, CA 91403

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

King Pool Plaster and Tile Replacement and West Campus Pool Plaster and Tile Replacement and Filter Replacement
Infrastructure
Bidding
$860,000 est. value
Berkeley, CA 94707

Pool Service and Maintenance at North Natomas Community Center and Aquatic Complex
Infrastructure
Post-Bid
Sacramento, CA 95833

The Pool and Water Filter System Maintenance
Infrastructure
Post-Bid
Stockton, CA 95207

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Johnston Pool Resurfacing
Alteration
Results
$231,750 est. value
Sacramento, CA 95815

India and Beech Residential Tower
New Construction - 11,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
San Diego, CA 92101

The Bellwood
New Construction, Demolition - 241,754 SF
Pending Verification
$10,000,000 CJ est. value
Los Angeles, CA 90064

Los Angeles Chargers Headquarters & Training Facility
New Construction, Infrastructure
Conception
El Segundo, CA 90245

2211 S Western Avenue Mixed Use Development
New Construction, Build-Out, Infrastructure
Design
$30,000,000 est. value
Los Angeles, CA 90018

Downtown Aquatic Center Pool Re-Plastering Project
Alteration
Post-Bid
$270,000 est. value
Costa Mesa, CA 92626

Mangan Pool Resurfacing
Alteration
Results
$247,170 est. value
Sacramento, CA 95822

Reported 01/15/2022 12:00 AM
Project Title

Loma Verde Recreation Center Project (Pool Work)

Physical Address View project details and contacts
City, State (County) Chula Vista, CA 91911   (San Diego County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Design-Build Firm to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Services INTERESTED PARTIES SHOULD CONTACT EC CONSTRUCTORS DIRECTLY (SEE ATTACHMENT MEMO). DO NOT CONTACT THE CITY WITH RESPECT TO THIS BIDDING OPPORTUNITY. EC Constructors, Inc. (ECC) is the Design-Builder for the Loma Verde Recreation Center Project (Segments 1 &2) in the City of Chula Vista and as such invites bids for all trades for participation in design completion and construction of the new facilities. See the attachment memo for details on how to access bidding documents. ECC will conduct a site visit on Thursday, December 30, 2021 at 11:00 AM at 1420 Loma Lane, Chula Vista, CA 91911 for all subcontractors interested in reviewing the existing site conditions prior to bid preparation. All Subcontractors are encouraged to attend site visit. Addenda will be issued to clarify questions to all bidders. It is the subcontractor's responsibility to check ECC ftp site prior to providing its bid to ensure it has seen all addenda. Addenda shall be noted on proposal form provided to ECC.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents