Similar Projects
Wastewater Treatment Plant
New Construction
Design
Buena Vista, GA

Replace Two Bladder Tanks and Pumphouse - USDA, ARS
New Construction
Design
Griffin, GA 30223

Mays Crossing Lift Station and Force Main Rehab
New Construction, Infrastructure
Bidding
Stockbridge, GA

Riverside Drive WTP FY2022 Basin Coatings Project
Renovation
Bidding
Gainesville, GA 30501

Riverside Drive WTP High Service Pump No. 7
Post-Bid
Gainesville, GA 30501

Water Treatment Services (Annual Contract)
Term Contract
Post-Bid
Savannah, GA 31401

Chattahoochee River Intake Pump Station
Results
Atlanta, GA 30303

DOA Sanitary Sewer Lift Stations Operation and Maintenance
Results
Atlanta, GA 30301

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

Vine and Goodyear Pump Station Elimination
New Construction, Infrastructure
Bidding
Social Circle, GA

Loopers WTP Dewatering Facilities Upgrade
Post-Bid
Dalton, GA

Ridgewood Water Production Facility
Results
Brunswick, GA 31520

Atlanta-Newnan Road Pump Station and Force Main
New Construction, Infrastructure
Bidding
Atlanta, GA

2019 Water Pollution Control Facilities Rehabilitation Academy Creek BGJWSC
Post-Bid
Brunswick, GA 31520

Booster Pump Station Replacement
Results
Adairsville, GA 30103

Last Updated 07/21/2021 04:39 PM
Project Title

New River WPCP and Southwest LS Upgrades

Physical Address View project details and contacts
City, State (County) Tifton, GA   (Tift County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,524,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work at the WPCP shall include replacement of the existing bar screen, retrofit of the grit removal system with new grit slurry pumps and grit separation cyclones, replacement of aeration diffusers, and overhaul of the sludge digester disc aeration system. Work at the Southwest Lift Station shall include removal of existing submersible pumps and replacement with new chopper pumps to eliminate constant maintenance issues.

Details

Water Treatment Plant, New Construction, Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents