Similar Projects
Lockheed Martin Wastewater Tie-On Modified - Phase 1
Infrastructure
Conception
$1,000,000 est. value
Marietta, GA 30060

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
Kennesaw, GA 30144

FY2023 Resurfacing Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Smyrna, GA 30080

FY23 UPC for Manhole and Valve Box Adjustments
Infrastructure
Bidding
Marietta, GA

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Prequalification Of Contractors for The Period 2021-2022
Post-Bid
Marietta, GA

Pre-Qualifying Pipeline Contractors
Infrastructure
Post-Bid
GA

Fy22 Miscellaneous Water Main Replacements
Results
Marietta, GA

Wilderness Way Two Way Water Feed
Results
GA 30066

Morningside Drive Duplex
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Marietta, GA 30060

Windy Hill Road ADA Upgrades Project
Infrastructure
Bidding
$400,000 CJ est. value
Smyrna, GA 30080

Materials For San Fernando Drive Waterline Project
Infrastructure
Post-Bid
Smyrna, GA

Fire Hydrant Testing and Maintenance
Term Contract
Results
$135,000 est. value
Acworth, Austell, Kennesaw, Mableton, Marietta, Powder Springs, Smyrna, GA 30127

Krystal / Mableton
New Construction, Infrastructure - 1,867 SF
Bidding
$575,000 CJ est. value
Mableton, GA 30126

2023 Blow-Off Replacements
Infrastructure
Post-Bid
$2,000,000 est. value
Marietta, GA

Last Updated 07/28/2022 02:31 PM
Project Title

Creatwood Trail Area Waterline Replacement

Physical Address View project details and contacts
City, State (County) Smyrna, GA 30080   (Cobb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $742,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Smyrna is requesting Sealed Bids for a unit-price contract for the installation of approximately 6,500 linear feet of new 6-inch PVC, 4,800 linear feet of new 8-inch PVC and the reconnections of existing water mains, service laterals and fire hydrants. The existing asbestos cement pipe and cast iron water mains will be abandoned in place. TIME FOR COMPLETION: The contract time for Substantial Completion for the total project is 180 calendar-days. The City of Smyrna reserves the right to accept or reject any or all Quotations and award in the best interest of the City.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents