Similar Projects
De Zavala Splash Pad CDBG
New Construction
Bidding
$460,000 est. value
Edinburg, TX

Wastewater Process Unit Cleaning and Evaluation
Infrastructure
Bidding
$7,500,000 est. value
Houston, TX

Certification and Calibration of Well Water Meters
Post-Bid
Houston, TX 77072

Pump
Post-Bid
Austin, TX

Water Treatment Plant Facilities Pump and Motor Maintenance and Repair Services
Results
Less than $2,762,500 est. value
Round Rock, TX 78664

Pump Repair
Term Contract
Results
$65,000 est. value
Plano, TX 75023

Mechanical Services for Maintenance and Repairs of Pumps at Water Plants
Infrastructure
Bidding
Baytown, TX

Labor and Material to Replace The Fire Pump
Post-Bid
Three Rivers, TX 78071

Pump Repairs Trinity River Pump Station
Results
Dayton, TX 77535

Artesia Pump Station Well Nos - 7 and 8 Drilling and Construction
Infrastructure
Bidding
$10,000,000 est. value
San Antonio, TX 78219

Houlihan Well
Post-Bid
Aubrey, TX

Wharton Well and Water Plant Contract No. 1 - Pump and Control Building, Storage Tank, and General Site Work Contract No. 2 - Well Construction
Results
$1,800,000 to $2,500,000 est. value
Wharton, TX

Proposed Water Well No. 4
Alteration
Bidding
$200,000 est. value
Houston, TX 77067

Well Service
Post-Bid
Bushland, TX 79012

CR 1825 Deep Well and Pump
Results
Crockett, TX

Last Updated 07/14/2022 04:17 AM
Project Title

Simsboro Aquifer Water Treatment Plant, Well Field and Transmission Facilities

Physical Address View project details and contacts
City, State (County) Bastrop, TX   (Bastrop County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes construction of three (3) new water wells in the Simsboro Aquifer, and completion of an existing well; approximately 14,000 lf of 10” to 24” well field gathering pipeline to convey raw water to the water treatment plant; a new 6 million gallons per day (MGD) water treatment plant with chemical feed systems and conventional filtration for removal of iron and manganese; office/laboratory building; chemical storage/feed building; concrete ground storage tank; transfer pump station and approximately 21,500 lf of 24” transmission pipeline; wastewater lift station and approximately 21,500 lf of 8” force main; standby electrical generator and other ancillary facilities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents