Similar Projects
First Street Pond and Wastewater Pump Station
New Construction
Bidding
Grants, NM

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Equip Brandy Well 1, an Existing Well with a Solar Pumping System
Post-Bid
Cuba, NM 87013

NGWSP 4c-8
Results
$100,000,000 est. value
Shiprock, NM

North Main Sewer Pump Station
Results
Aztec, NM 87410

Construction of Port of Entry Fire Line, Tank, and Booster Pump Station
Post-Bid
Columbus, NM 88029

Effluent Loadout Station
Results
Less than $311,420 est. value
Los Lunas, NM

Construction of Lift Station Improvements
Post-Bid
Estancia, NM 87016

Wastewater Lift Station Maintenance and Repair Services
Results
Las Cruces, NM 88007

Band Replace Sewer and Water System
Post-Bid
$500,000 to $1,000,000 est. value
Los Alamos, NM 87544

Tank 4 to Tank 1 Booster Pump Station and Transmission Line
Results
Santa Fe, NM 87508

Glenwood Gila Trout Facility
New Construction
Post-Bid
Glenwood, NM

Valley Water and Sanitation District Booster Station
Results
Kirtland, NM 87417

Lift Stations and Forcemains
New Construction
Post-Bid
Ruidoso, NM 88345

Metro Verde Lift Station
Results
Las Cruces, NM 88004

Reported 02/20/2021 12:00 AM
Project Title

Goat Summit Booster Station

Physical Address View project details and contacts
City, State (County) Mescalero, NM   (Otero County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 755 linear feet of 8-inch PVC sewer main extension and approximately 4 manholes. Construction of a new lift station(including all concrete, pumps, rails, and MH coating), construction of a new check valve structure(including piping and magmeter), installation of 3-phase power line extension and electrical panel at lift station, and installation of fencing around lift station. Installation of approximately 140 linear feet of 4-inch sewer force main to connect to existing force main. Installation of approximately 400 linear feet of 8-inch PVC sewer main extension and 8-inch gate valve and 8-inch fire hydrant, Installation of approximately 312 linear feet of 1-inch PE water service line.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents