Similar Projects
Widens I-40 to A Six-Lane Facility From I-85
Bidding

Burma Drive Extension
Bidding
Apex, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Milling, Resurfacing and Shoulder Grading
Bidding
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

2019 Pavement Preservation
Results
$100,000 to $250,000 est. value
NC

Milling, Resurfacing and Shoulder Grading
Bidding
NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Yonkers Road Improvements
Results
Less than $10,000,000 est. value
Raleigh, NC

Park Depot Greenway
Post-Bid
Fuquay-Varina, NC

Street Repairs and Repaving 2020
Results
Less than $5,164,565 est. value
Durham, NC

Tryon Road Part C Widening Project
Post-Bid
Raleigh, NC

Last Updated 03/18/2020 03:37 AM
Project Title

Milling and Resurfacing

Physical Address View project details and contacts
City, State (County) (Durham, Wake Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

22 Sections of NC – 147 and Sections of NC – 540. Roadway Items Lump Sum Ls Mobilization 570,316 Sy Milling Asphalt Pavement, ***" Depth (1-1/2") 1,705 Sy Milling Asphalt Pavement, ***" Depth (2") 1,781 Sy Milling Asphalt Pavement, ***" To ******" (1-1/2" To 2") 362 Sy Incidental Milling 47,778 Ton Asphalt Conc Surface Course, Type s9.5d 2,723 Ton Polymer Modified Asphalt Binder For Plant Mix 64,297 Lf Milled Rumble Strips (Asphalt Concrete) 2 Ea Adjustment Of Manholes 2,635 Sf Work Zone Advance/General Warning Signing Lump Sum Ls Temporary Traffic Control Lump Sum Ls Generic Traffic Control Item Install Dept Furnished Marking At Green Level West Nb Exit Loop Lump Sum Ls Generic Traffic Control Item Install Dept Furnished Marking At Green Level West Sb Exit Ramp Lump Sum Ls Generic Traffic Control Item Install Dept Furnished Marking At Nc 54 Nb Exit Loop Lump Sum Ls Generic Traffic Control Item Install Dept Furnished Marking At Nc-55 Bypass Sb Exit Ramp Lump Sum Ls Generic Traffic Control Item Install Dept Furnished Marking At s Salem St Nb Exit Loop Lump Sum Ls Generic Traffic Control Item Install Dept Furnished Marking At Veridea Parkway Nb Exit Ramp Lump Sum Ls Generic Traffic Control Item Install Dept Furnished Marking At Veridea Parkway Sb Exit Loop 250,592 Lf Thermoplastic Pavement Marking Lines (4", 90 Mils) 15,980 Lf Thermoplastic Pavement Marking Lines (8", 90 Mils) 8 Ea Thermoplastic Pavement Marking Character (90 Mils) 129 Ea Thermoplastic Pavement Marking Symbol (90 Mils) 251,154 Lf Paint Pavement Marking Lines (4") 15,564 Lf Paint Pavement Marking Lines (8") 630 Lf Paint Pavement Marking Lines (24") 2 Ea Paint Pavement Marking Character 129 Ea Paint Pavement Marking Symbol 630 Lf Generic Pavement Marking Item Thermoplastic Pavement Marking Lines (24", 90 Mils) 1,885 Ea Snowplowable Pavement Markers Lump Sum Ls Portable Lighting 4,648 Lf Inductive Loop Sawcut

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents