Similar Projects
Z2DA--Correct HVAC Deficiencies
Infrastructure, Alteration
Design
$1,000,000 to $5,000,000 est. value
Hampton, VA

B2032 Repair HVAC Systems
Infrastructure
Design
$500,000 to $1,000,000 est. value
Quantico, VA

HVAC Installation at Fauquier County Adult Detention
Alteration
Bidding
Warrenton, VA 20186

Upgrades to HVAC - Fralin, Webber and Humanities
Alteration
Bidding
Roanoke, VA 24015

Maintenance and Repair Services for Fume Hoods/Controllers
Post-Bid
Annandale, VA 22003

HVAC, Preventive Maintenance, Repair, and Emergency Service
Term Contract
Post-Bid
Alexandria, VA 22314

Chiller Maintenance Services
Results
Dahlgren, VA 22448

CSS 17592 - Replace 250 Gallon Air Compressor, Fort Eustis (VA056)
Results
Fort Eustis, VA

Waterfield Bldg. Ceiling Modernization Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Norfolk, VA

Automatic Temperature Control System Replacement at Olde Creek Elementary School
Alteration
Bidding
Fairfax, VA 22032

HVAC Upgrade 1103-02F
Post-Bid
Dahlgren, VA

DFS Eastern Lab Cooling Tower Replacement
Results
Less than $678,556 est. value
Norfolk, VA

FT AP Hill Renovations
Renovation, Term Contract, Alteration
Design
$1,000,000 to $5,000,000 est. value
Port Royal, VA 22535

HRBT Admin HVAC Replacement
Alteration
Bidding
Hampton, VA 23663

Preventive Maintenance on Boilers at Cold Springs Correctional Unit 10 and Cold Springs Men's CCAP
Term Contract
Post-Bid
Charlottesville, VA

Last Updated 02/16/2022 12:22 PM
Project Title

HVAC Replacements at Douthat State Park

Physical Address View project details and contacts
City, State (County) Millboro, VA 24460   (Bath County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose and intent of this Quick Quote is to obtain a fixed price bid to furnish all labor, materials, tools, equipment, insurance, and supervision to conduct replacement of the existing Bryant and Trane model HVAC systems and render operational a new/unused Trane or Agency approved Equivalent located on the grounds of Douthat State Park. The work is to replace the existing (6) six each specified units below with like and kind per specifications 1.Contractor shall provide, install and render operational Main Office (HP1) Bryant, 5 ton, Model 697CN060A/SN0698E02701 with new/unused Trane or Agency Approved Equivalent matching the specified Seer Air handler and condenser units and heat strips to match the KW and number that are existing to replace entire existing system. 2.Contractor shall provide, install and render operational Main Office (HP2) Bryant, 3 ton, Model 697CN036B/SN4497E03585 with new/unused Trane or Agency Approved Equivalent matching the specified Seer Air handler and condenser units and heat strips to match the KW and number that are existing to replace entire existing system. 3.Contractor shall provide, install and render operational Creasy Lodge(32) Trane, 3 ton, Model 4TWB3036C1000AA/SN14206RN3BF with new/unused Trane or Agency Approved Equivalent matching the specified Seer Air handler and condenser units and heat strips to match the KW and number that are existing to replace entire existing system. 4.Contractor shall provide, install and render operational Beach Complex Trane, 2.5 ton, Model 2TWR3030A1000AA/SN719377H4F with new/unused Trane or Agency Approved Equivalent matching the specified Seer Air handler and condenser units and heat strips to match the KW and number that are existing to replace entire existing system. Contractor shall provide, install and render operational Beach Complex Trane, 5 ton, Model 2TWR3060A1000AA/SN71731JT2F with new/unused Trane or Agency Approved Equivalent matching the specified Seer Air handler and condenser units and heat strips to match the KW and number that are existing to replace entire existing system. 6.Contractor shall provide, install and render operational Beach Complex Trane, 3.5 ton, Model 2TWR3042A1000AA/SN7201NS22F with new/unused Trane or Agency Approved Equivalent matching the specified Seer Air handler and condenser units and heat strips to match the KW and number that are existing to replace entire existing system. 7.Contractor shall provide and install new/unused applicable refrigerant line, fiberglass or equivalent pad, and programmable thermostat. 8.Contractor shall provide and install new/unused supply and return transitions, condensate drain pan and condensate piping outside building foundations. 9.Contractor shall install New/Unused 16 seer unit with matching air handler including auxiliary heat strips with comparable KW number to the existing unit. The tonnage of the heat pump unit and air handler shall be comparable to existing unit size as to not require new duct work to be installed. 10.Contractor shall repair any ductwork to the units being replaced that is currently damaged or missing to ensure proper system functionality. 11.Contractor shall remove existing units from the premises and dispose in accordance with all local and national standards. All refrigerants shall be handled in an environmentally responsible manner in accordance with the Clean Air Act. 12.Contractor shall enlarge openings where necessary to install New/Unused unit. 13.Contractor is responsible for any carpentry needed to enlarge access openings including trim and finishing matching existing woodwork.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents