Similar Projects
Reported | 06/30/2022 09:25 AM |
Project Title | Window Replacement |
Physical Address | View project details and contacts |
City, State (County) | FL (Nassau County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids. |
Project Status | No Responses Submitted |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of removal of existing windows on the South side of the district office and the gym, prepping/framing the openings prior to installation of new windows and trim. Window Specification: Single hung-double pane, argon gas filled, non-impact 128 MPH minimum wind load with exposure C or D rating, double pane Argon Gas filled with a half screen. All windows shall allow for the bottom window to open vertically, and each window shall have a grid with 9 panes in each. Sloped sill, welded frame, uPVC, with reinforcement in meeting rails & sashes |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |