Similar Projects
Intermountain CC - Window/Siding Installations
Alteration
Bidding
Nubieber, CA 96068

Install Access Doors and Locks at Bridge Abutments
Alteration
Bidding
$216,000 est. value
CA

Poultry and Egg Processing Plant Door Maintenance and Repair at Avenal State Prison (ASP)
Term Contract
Post-Bid
Avenal, CA 93204

Annual Contract for Emergency Garage Door Repairs at all Fire Stations
Term Contract
Post-Bid
Visalia, CA

Del Valle PP Window Removal Replacement Services
Alteration
Results
Livermore, CA 94550

Fire Station No.2 Window Replacement
Alteration
Results
Less than $450,000 est. value
Stockton, CA 95203

Americans with Disabilities Act (ADA) Door Operator and Card Reader Services
Alteration
Bidding
$388,000 est. value
Rancho Cordova, CA 95742

Baymark Dosing Rooms
Alteration
Post-Bid
Carmichael, CA 95608

IFB Repair and/or Replace Roll-up Doors
Alteration
Results
Barstow, CA

SE Hangar Door Repair BLDG 1106
Alteration
Post-Bid
McClellan, CA 95652

Window Seal Replacement
Alteration
Results
San Jose, CA

Bay Door Maintenance
Alteration
Post-Bid
San Bernardino, CA 92371

Swinging Door Inspections, Repair and Maintenance
Term Contract
Results
San Jose, CA

CHP Cache Creek Platform Scale - Bay Door Maintenance Services
Alteration
Post-Bid
Sacramento, CA

City Council Chambers Renovations
Alteration
Results
Palm Desert, CA 92260

Last Updated 04/08/2022 04:16 PM
Project Title

Garage Door Removal and Replacement

Physical Address View project details and contacts
City, State (County) Yosemite National Park, CA   (Mariposa County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of 6 panel-type garage doors at the El Portal Maintenance Facility. #1 – Measurements 96” x 146”, location Shipping and Receiving Loading Dock #2 – Measurements 120” x 146”, location Shipping and Receiving Loading Dock #3 – Measurements 120” x 146”, location Shipping and Receiving Loading Dock #4 – Measurements 96” x 146”, location Shipping and Receiving Driveway #5 – Measurements 108” x 146”, location Commissary #6 – Measurements 108” x 146”, location Trails Shop

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents