Similar Projects
I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Kinney Way Sidewalk Improvements
Term Contract
Results

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

Stormwater and Accessible Sidewalk Upgrades at Mansfield School
Infrastructure
Results
$495,000 est. value
Mansfield, WA 98830

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pangborn Memorial Airport Taxiway A Realignment
Infrastructure
Post-Bid
East Wenatchee, WA 98802

Parking Lot Paving at Canyon View Community Facility
Infrastructure
Post-Bid
$200,000 est. value
East Wenatchee, WA 98802

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

Hot Mix Asphalt
Infrastructure
Post-Bid
East Wenatchee, WA

Hamilton Street Improvements
Infrastructure
Results
$700,000 to $1,000,000 est. value
East Wenatchee, WA 98802

9th Street North East and Valley Mall Parkway Intersection Improvements
Infrastructure
Post-Bid
$1,000,000 est. value
East Wenatchee, WA 98802

9th Street North East and Valley Mall Parkway Intersection Improvements
Infrastructure
Post-Bid
$1,000,000 est. value
East Wenatchee, WA 98802

Reported 07/15/2022 12:00 AM
Project Title

Center Street Sidewalks

Physical Address View project details and contacts
City, State (County) Rock Island, WA 98850   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of roadway work shall include, but not limited to traffic control, sidewalk, curbing, paving, striping, ADA ramp improvements, illumination, stormwater system improvements, and related work in accordance with the contract plans, special provisions, and the WSDOT/APWA Standard Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents