Similar Projects
Bristol Streambank Stabilization, EWP Site 5038-016
Infrastructure
Bidding
$280,000 to $310,000 est. value
Bristol, VT 05443

ANR-FPR Camel's Hump State Park Culvert Replacement
Infrastructure
Bidding
Duxbury, VT

Newbury Elementary School Drainage/ Grading Work and Concrete Wall Replacement
Post-Bid
Newbury, VT 05051

Shady Rill Recreation Area Streambank Restoration - Phase 3 Implementation
Post-Bid
Middlesex, VT

River Bank Retaining Wall Replacement
Results
$1,600,000 est. value
Springfield, VT

Rogers Road Culvert Replacement
Results
Westford, VT 05494

2020 Grants in Aid Project
Post-Bid
Norwich, VT 05055

2020 Maple Hill Road Culvert Replacement
Results
Barton, VT 05822

Garvin Hill Road and Grout Road Project
Infrastructure
Post-Bid
$25,000 est. value
Hartland, VT

Cady Road Culvert No. 2 Replacement Project
Results
$105,000 est. value
Middlebury, VT

Fisher Road Culvert Replacement
Infrastructure
Post-Bid
Berlin, VT 05602

Church and Park Street Culvert Replacement
Results
$780,000 est. value
Rutland, VT 05702

Ditching and Culvert Replacement
Infrastructure
Post-Bid
Bethel, VT

Thetford IM SCRP (22)
Term Contract
Results
$250,000 to $500,000 est. value
Thetford, VT 05074

Wheelerville Road Culvert 07-42 Replacement Project
Results
Mendon, VT 05701

Reported 07/23/2021 10:41 AM
Project Title

South Street Trestle Structure Repair Project

Physical Address View project details and contacts
City, State (County) Castleton, VT   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes replacing damaged rebar reinforced poured concrete wing walls on the entrance and exit ends of a concrete box culvert, replacing approximately 13.33 cubic yards of embankment armor, resetting four-six guardrail posts, removing approximately 200 linear feet of existing pavement the entire existing width of the roadway, removing overburden from atop the entrance and exit ends of the culvert, and replacing two crossroad culverts. This project requires a permit to work in the stream and requires mitigation measures prescribed by the State of Vermont Department of Environmental Conservation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents