Similar Projects
Locust Street; 2nd Street to Fonner Park Road - City of Grand Island
Infrastructure
Conception
$450,000 CJ est. value
Grand Island, NE 68801

Locust Street; 2nd Street to Fonner Park Road - City of Grand Island
Infrastructure
Conception
$450,000 CJ est. value
Grand Island, NE 68801

Grand Island Central Catholic Elementary School
Addition, New Construction, Infrastructure - 27,500 SF
Design
$9,000,000 CJ est. value
Grand Island, NE 68803

RFP Construction Management at Risk - Construction Management at Risk Services for a School Facilities Improvement Project
Demolition, New Construction, Build-out, Infrastructure
Design
$27,000,000 CJ est. value
Cairo, NE 68824

Lead Service Line Replacement
Infrastructure
Bidding
$270,000 CJ est. value
Grand Island, NE 68801

Lead Service Line Replacement
Infrastructure
Bidding
$270,000 CJ est. value
Grand Island, NE 68801

Grand Island Public Schools - Senior High Additions & Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Grand Island, NE 68803

Gates Elementary School Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$8,500,000 CJ est. value
Grand Island, NE 68803

Curb Ramp Project
Infrastructure
Results
$105,988 CJ est. value
Grand Island, NE 68801

Curb Ramp Project
Infrastructure
Results
$105,988 CJ est. value
Grand Island, NE 68801

Conestoga Mall Redevelopment
Demolition, New Construction, Infrastructure, Renovation - 200,000 SF
Construction
$220,000,000 CJ est. value
Grand Island, NE 68803

Conestoga Mall Redevelopment
Demolition, New Construction, Infrastructure, Renovation - 200,000 SF
Construction
$220,000,000 CJ est. value
Grand Island, NE 68803

Target at Conestoga Mall / Grand Island
New Construction, Infrastructure - 150,000 SF
Pending Verification
$40,000,000 CJ est. value
Grand Island, NE 68803

Target at Conestoga Mall / Grand Island
New Construction, Infrastructure - 150,000 SF
Pending Verification
$40,000,000 CJ est. value
Grand Island, NE 68803

Glover Downtown Parking Lot Improvements
Infrastructure
Bidding
$1,183,000 CJ est. value
Grand Island, NE 68803

Last Updated 10/18/2023 07:31 AM
Project Title

Nebraska State Fair Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Grand Island, NE 68801   (Hall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $925,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The project consists of construction approximately 800 SY of 10 concrete pavement, 12,800 SY of 7 concrete pavement, 12,000 SF of 5 concrete sidewalk, 4,100 SF of 5 concrete flume, 2,800 LF of 12 , 15 , 18 , 24 , 30 , and 36 storm sewer pipe, 115 LF of 15 directionally bored storm sewer pipe, drainage structures, detention ponds, removals, clearing and grubbing, ditch grading for outlet structures, grading and earthwork, traffic control, 23 acres of seeding and watering, and all other associated work as indicated on the drawings and within the specifications. Bid security shall be furnished in accordance with the Instruction to Bidders. The check(s) or (s) shall be made payable to the Nebraska State Fair Board, 501 East Fonner Park Rd, Ste 200, Grand Island, NE 68801 as security that the bidder(s) to whom the award(s) are made will enter into contract to build the improvements bid upon and furnish the required bonds and insurance. The Owner reserves the right to accept any bid which it deems most advantageous to the Owner, and to reject any or all bids submitted and to hold as many bids as it desires for consideration for a period of sixty (60) days after the bids are open. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. 1. Contractors and subcontractors on USEPA federally assisted construction projects are required to pay their laborers and mechanics wages not less than those established by the U.S. Department of Labor. A current wage decision containing the appropriate building and/or heavy type rates is included in the specifications for bidding purposes.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents