Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

New Sheriff Building & Detention Center Improvements
New Construction, Renovation
Design
Oxford, MS

Rehabilitate Taxiway a, Phase 2 and Rehabilitate Taxiway B, Phase 1 at the Jackson-Aedgar Wiley Evers International Airport
Infrastructure
Design
$525,000 CJ est. value
Jackson, MS 39208

Water System Improvements
Infrastructure
Bidding
$503,085 CJ est. value
Bassfield, MS 39421

Waveland Pole Barn Replacement - Rebid
Demolition, New Construction, Infrastructure
Bidding
$220,000 CJ est. value
Waveland, MS 39576

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

2021 Wastewater Improvements
Renovation, Infrastructure
Construction
$338,600 CJ est. value
Hickory, MS 39332

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

RFQ D/B - New Parking Garage at the G.V. Montgomery VA Medical Center
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Jackson, MS 39216

Jail Construction
New Construction
Bidding
$3,000,000 est. value
Vicksburg, MS

Industrial Site Grading
Infrastructure
Post-Bid
MS

2020 Alterations and Additions LCDC
Renovation, Addition
Results
Oxford, MS 38655

Last Updated 09/12/2022 02:43 PM
Project Title

Simpson County Jail - Trustee Expansion

Physical Address View project details and contacts
City, State (County) Mendenhall, MS 39114   (Simpson County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $160,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Questions regarding website registration and online orders please contact Plan House Printing, 607 W. Main Street, Tupelo, MS 38804, (662) 407-0193. Bids must be submitted on the form to be furnished by the architect and must be accompanied by bid bond or certified check for at least five percent (5%) of the base bid payable to Simpson County. Bid envelope must contain on the outside of the envelope, the Contractor's current Certificate of Responsibility Number and the Contractor's License Number unless a statement on the exterior says that the bid enclosed is less than or did not exceed $50,000.00. Bid preparation will be in accordance with Instructions to Bidders bound in the project manual. Simpson County reserves the right to waive irregularities and to reject any or all bids submitted. Please submit all questions via email to Chris Myers at cmyers@cdfl.com. The final day for addenda is Monday, September 12.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents