Similar Projects
Sidewalk Expansion - Woodstock Campus
Bidding
Woodstock, GA 30188

Lowe's #2838
Post-Bid
Canton, GA 30115

Lowe's #543
Post-Bid
Woodstock, GA 30189

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Parking Lot Expansion-Woodstock
Results
Woodstock, GA 30188

LMIG Restriping Ridgewalk Parkway and Maintenance
Results
Less than $108,000 est. value
Woodstock, GA

Etowah River Park Trail Extension From East of I-575 Bridge to near the end of Doss Road
Results
Canton, GA 30114

Hickory Road and Palm Street Sidewalk and Drainage Projects
Results
Holly Springs, GA 30115

Holly Court Drainage Repairs
Results
Acworth, GA 30101

Ridgewalk Parkway at Main Street Intersection Improvements
Results
Less than $81,400 est. value
Woodstock, GA 30188

Construction Services - Arborhill Drive at Primrose Lane Storm Drainage Repair
Results
Canton, GA 30114

2020 Stormwater Maintenance Project
Results
$100,000 to $150,000 est. value
Holly Springs, GA 30115

Holly Springs Mixed-Use Site Work and Infrastructure
Results
Less than $6,200,000 est. value
Holly Springs, GA 30142

Gaddis Road Drainage Improvements
Results
GA

Last Updated 01/23/2020 01:57 PM
Project Title

Etowah River Park Trail Extension (From Etowah Park Boat Ramp Parking Lot To East Of I-575 Bridge)

Physical Address View project details and contacts
City, State (County) Canton, GA 30114   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of erosion control measures, clearing and grubbing, grading, the construction of storm drainage concrete trail and elevated boardwalk, parking lots, site furnishing, signage, landscape improvements, along the Etowah River.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents