Similar Projects
Last Updated 04/15/2022 12:32 AM
Project Title

Simeon HS- Chiller Repairs

Physical Address View project details and contacts
City, State (County) Chicago, IL 60620   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CHILLER # 1 Remove and Replace Control Fuses. CIRCUIT # 3 Pump Out and Remove Oil from Circuit. Pump In New Oil into Circuit. Remove and Replace Slide Transducer. Perform Nitrogen Leak Test and Repair Soderable Leaks. Place Vacuum on the System and Leave Overnight for a Tight Seal. Remove and Replace Filter Driers. Charge Circuit with 285 LBS of 134 A Refrigerant. CIRCUIT # 1 Pump Out and Remove Oil from Circuit. Pump In New Oil into Circuit. Perform Nitrogen Leak Test and Repair Soderable Leaks. Place Vacuum on the System and Leave Overnight for a Tight Seal. Remove and Replace Site Glass Remove and Replace Filter Driers. Charge Circuit with 285 LBS of 134 A Refrigerant. CHILLER # 2 Remove and Replace Control Fuses. CIRCUIT # 3 Pump Out Oil and Remove Oil from Circuit. Pump In New Oil into Circuit. Remove and Replace Slide Transducer. Perform Nitrogen Leak Test and Repair Soderable Leaks. Place Vacuum on the System and Leave Overnight for a Tight Seal. Remove and Replace Filter Driers. Charge with 285 LBS of 134 A Refrigerant. CIRCUIT # 1 Pump Out Oil and Remove Oil from Circuit. Pump In New Oil into Circuit. Charge with 60 LBS of 410 A Refrigerant.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents